Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
SINGLE FAMILY NEW
Address:
650 W ROGER RD
Address NEW:
650 W ROGER RD
Apply Date:
05/07/2021
Applicant:
Dora godinez
Description:
SFR
Contractors:
  • silva diversified construction llc

Permit Reviews

Permit Number - T21CM03883
Permit Status: C of o
Permit Description: SFR
Start Date Submittal Complete Date Status  
05/07/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 06/08/2021 COMPLETED Review Details
06/14/2021 RESUBMITTAL 06/15/2021 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T21CM03883
Permit Description: SFR
Total Completed Inspections - 25
Date Description Inspector Results Comments
06/21/2021 PLUMBING - SEWER HCS CONNECT DQUINN Approved APPROVED 3 INCH TO 4 INCH TO SPETIC TANK. PCWW APPROVED
06/21/2021 PLUMBING - ROUGH, SOIL DQUINN Approved
06/23/2021 ELECTRIC - UNDERGROUND DQUINN Approved
06/23/2021 ELECTRIC - UFER DQUINN Approved
06/23/2021 BUILDING PRE-SLAB DQUINN Approved
06/23/2021 EXCAVATION/LAYOUT REBAR & ZON DQUINN Approved
07/13/2021 ROOF NAILING DQUINN Approved Ap
07/13/2021 EXT METAL CLIPS/EXT SHEATHING DQUINN Approved Ap
08/03/2021 FRAMING DQUINN Approved Ap
08/03/2021 RESIDENTIAL INTERMEDIATE DQUINN Approved Ap
08/03/2021 MECHANICAL - INTERMEDIATE DQUINN Approved Ap

1. Redo gas test.
2. Screw toilet flanges to floor.
3. install platform and tpr drain for water heater.
4. Install bang plates where needed.
5. Move closet lights from shelving where needed.
08/04/2021 PLUMBING - INTERMEDIATE DQUINN Approved Ap
08/13/2021 TEP CLEARANCE - PM DQUINN Approved CODE ECO
08/13/2021 ELECTRIC - CONSTRUCTION POWER DQUINN Approved Ap

Clear eco
08/24/2021 PLUMBING - YARD WTR LINE/TEST DQUINN Approved Ap
09/14/2021 BUILDING - FINAL DQUINN Approved APPROVED BY INSPECTOR
AWAITING CONDITIONS
09/14/2021 GAS CLEARANCE DQUINN Approved CODE
09/14/2021 SHEET ROCK NAILING DQUINN Approved 1090 (BUILDING - FINAL) Ap
09/14/2021 MECHANICAL - FINAL DQUINN Approved Ap

Clear gas for new sfr

Close permit
09/14/2021 PLUMBING - FINAL DQUINN Approved Ap
09/14/2021 SEPTIC - SYSTEM DQUINN Approved Ap
09/14/2021 PLUMBING - GAS PRESSURE TEST DQUINN Approved Ap
09/14/2021 OUTDOOR LIGHTING FINAL DQUINN Approved Ap
09/14/2021 ELECTRIC - FINAL DQUINN Approved Ap
09/14/2021 BUILDING - FINAL DQUINN Approved Ap

Documents

File Name Document Type  
SPEC SHEETS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
C OF O.PDF CERT OF OCC VIEW
PLAN SET.PDF CONSTRPLANS VIEW
APPLICATION.PDF DOCUMENTS VIEW