Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
04/27/2021
Applicant:
Description:
SFR, one five units

Permit Reviews

Permit Number - T21CM03552
Permit Status: Complete
Permit Description: SFR, one five units
Start Date Submittal Complete Date Status  
01/31/2022 RESUBMITTAL 02/03/2022 COMPLETED Review Details
04/27/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 05/19/2021 COMPLETED Review Details
11/08/2021 RESUBMITTAL 12/01/2021 COMPLETED Review Details

Conditions

Permit Number - T21CM03552
Permit Status: Complete
Permit Description: SFR, one five units
Date Description Comments
02/03/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
02/03/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM03552
Permite Description: SFR, one five units
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
08/02/2023 COT - RSPL - Sewer N/A Not Applicable Duplicate inspection approved by Ralph M. On 6/12/23.
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - RSBU - Preslab N/A Not Ready
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/26/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready
02/07/2024 COT - FCON - Sprinkler - Final N/A Partial Pass Inspection for OH/Hydro only.
07/26/2024 COT - RSEL - Construction Power N/A Not Applicable
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM03552
Permit Description: SFR, one five units
Total Completed Inspections - 18
Date Description Inspector Results Comments
08/02/2023 COT - RSPL - Rough Soil Passed Underground plumbing is complete and under a water test without leaking.
08/02/2023 COT - RSPL - Yard Water Line Passed Water line is connected to water meter and under water pressure. Okay to shade piping and backfill trench.
08/02/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Footings are properly dug per plans, rebar reinforcement is installed per plans, forms are in place for monolithic footing and slab concrete pour. Okay to pour concrete for slab and footings.
08/02/2023 COT - RSEL - Grounding/Bonding Passed #4 Copper wire for Ufer ground is properly attached to the rebar reinforcement in footing.
08/02/2023 COT - RSBU - Preslab Passed Footings are properly dug per plans, rebar reinforcement is installed per plans, forms are in place for monolithic footing and slab concrete pour. Okay to pour concrete for slab and footings.
09/26/2023 COT - RSBU - Roof Nailing Passed All work per approved plans.
Note: Setbacks already approved. No Fire protection between units shown on plans, nor roof overhang dimensions.
01/11/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
01/11/2024 COT - LCPL - Plumbing Intermediate Passed
01/11/2024 COT - LCBU - Framing Passed
01/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/27/2024 COT - FCON - Sprinkler - Final Passed
07/26/2024 COT - RSEL - Outdoor Lighting Passed
07/26/2024 COT - RSEL - Electrical Final Passed
07/26/2024 RSBU - Building Final Passed
07/26/2024 RSME - Mechanical Progress Passed
07/26/2024 COT - RSME - Mechanical Final Passed
07/26/2024 COT - RSPL - Plumbing Final Passed
07/26/2024 COT - RSEL - Electrical Underground Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HVAC MANUAL J CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 3552 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 3552 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
HVAC MANUAL J CALCS.PDF DOCUMENTS VIEW
JOB CARD 3552.PDF DOCUMENTS VIEW
PERMIT 3552.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
HVAC MANUAL J CALCS.PDF DOCUMENTS VIEW
JOB CARD 3552.PDF DOCUMENTS VIEW
PERMIT 3552.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW