Permit: T21CM03551
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3534 E PRESIDIO RD BLDG 4
Address NEW:
3534 E PRESIDIO RD BLDG 4
Apply Date:
04/27/2021
Applicant:
Description:
SFR, one five units
Permit Reviews
Permit Number - T21CM03551
Permit Status: Complete
Permit Description: SFR, one five units
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/03/2022 | RESUBMITTAL | 02/03/2022 | COMPLETED |
| 04/27/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 05/19/2021 | COMPLETED |
| 11/08/2021 | RESUBMITTAL | 12/01/2021 | COMPLETED |
Conditions
Permit Number - T21CM03551
Permit Status: Complete
Permit Description: SFR, one five units
| Date | Description | Comments |
|---|---|---|
| 02/03/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 02/03/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM03551
Permite Description: SFR, one five units
Total Outstanding Inspections - 13
Completed Inspections
Permit Status: Complete
Permit Number: T21CM03551
Permit Description: SFR, one five units
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2023 | COT - RSPL - Sewer | Passed | Sewer connection is complete to main sewer line. Okay to shade and backfill trenches. | |
| 08/02/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings are properly dug per plans, rebar reinforcement is installed per plans, forms are in place for monolithic footing and slab concrete pour. Okay to pour concrete for slab and footings. | |
| 08/02/2023 | COT - RSBU - Preslab | Passed | Footings are properly dug per plans, rebar reinforcement is installed per plans, forms are in place for monolithic footing and slab concrete pour. Okay to pour concrete for slab and footings. | |
| 08/02/2023 | COT - RSEL - Grounding/Bonding | Passed | #4 Copper wire for Ufer ground is properly attached to the rebar reinforcement in footing. | |
| 08/02/2023 | COT - RSPL - Yard Water Line | Passed | Water line is connected to water meter and under water pressure. Okay to shade piping and backfill trench. | |
| 11/16/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/11/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 01/11/2024 | COT - LCBU - Framing | Passed | ||
| 01/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/27/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 07/26/2024 | RSME - Mechanical Progress | Passed | ||
| 07/26/2024 | COT - RSME - Mechanical Final | Passed | ||
| 07/26/2024 | COT - RSPL - Rough Soil | Passed | ||
| 07/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 07/26/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/26/2024 | COT - RSEL - Electrical Final | Passed | ||
| 07/26/2024 | RSBU - Building Final | Passed | ||
| 07/26/2024 | COT - RSEL - Outdoor Lighting | Passed |