Permit: T21CM03548
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3534 E PRESIDIO RD BLDG 1
Address NEW:
3534 E PRESIDIO RD BLDG 1
Apply Date:
04/27/2021
Applicant:
Description:
SFR, one five units
Permit Reviews
Permit Number - T21CM03548
Permit Status: Complete
Permit Description: SFR, one five units
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/03/2022 | RESUBMITTAL | 02/03/2022 | COMPLETED |
| 04/27/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 05/19/2021 | COMPLETED |
| 11/08/2021 | RESUBMITTAL | 12/01/2021 | COMPLETED |
Conditions
Permit Number - T21CM03548
Permit Status: Complete
Permit Description: SFR, one five units
| Date | Description | Comments |
|---|---|---|
| 05/18/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 02/03/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 02/03/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM03548
Permite Description: SFR, one five units
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
| 01/02/2024 | COT - LCBU - Framing | N/A | Not Ready | 1/2/24: canceled by contractor |
| 01/02/2024 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | 1/2/24: canceled by contractor |
| 01/02/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | 1/2/24: canceled by contractor |
| 01/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | 1/2/24: canceled by contractor |
| 01/02/2024 | RSME - Mechanical Progress | N/A | Not Ready | 1/2/24: canceled by contractor |
| 10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 01/02/2024 | COT - RSEL - Construction Power | N/A | Not Ready | 1/2/24: canceled by contractor |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM03548
Permit Description: SFR, one five units
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2023 | COT - RSPL - Sewer | Passed | ||
| 08/02/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings are properly dug per plans, rebar reinforcement is installed per plans, forms are in place for monolithic footing and slab concrete pour. Okay to pour concrete for slab and footings. | |
| 08/02/2023 | COT - RSEL - Grounding/Bonding | Passed | #4 Copper wire for Ufer ground is properly attached to the rebar reinforcement in footing. | |
| 08/02/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under a water test without leaking. | |
| 08/02/2023 | COT - RSPL - Yard Water Line | Passed | Water line is connected to water meter and under water pressure. Okay to shade piping and backfill trench. | |
| 08/02/2023 | COT - RSBU - Preslab | Passed | Footings are properly dug per plans, rebar reinforcement is installed per plans, forms are in place for monolithic footing and slab concrete pour. Okay to pour concrete for slab and footings. | |
| 11/14/2023 | BULD - Electrical Clearance | Passed | 11/14/23 clearance sent by email 11/9/23: TEP ECO for units 1,2,3,4 and 5 | |
| 11/16/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/11/2024 | COT - LCBU - Framing | Passed | ||
| 01/11/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 01/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/20/2024 | RSME - Mechanical Progress | Passed | ||
| 07/26/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 07/26/2024 | COT - RSME - Mechanical Final | Passed | ||
| 07/26/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/26/2024 | RSBU - Building Final | Passed | ||
| 07/26/2024 | COT - RSEL - Electrical Final | Passed |