Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/27/2021
Applicant:
Description:
NEW SHELL BUILDING

Permit Reviews

Permit Number - T21CM03547
Permit Status: Complete
Permit Description: NEW SHELL BUILDING
Start Date Submittal Complete Date Status  
02/05/2022 REVISION - - 3RD 02/28/2022 COMPLETED Review Details
04/28/2021 3RD PARTY REVIEW - COMMERCIAL 06/29/2021 COMPLETED Review Details
04/30/2022 REVISION - - 4TH 05/24/2022 COMPLETED Review Details
06/29/2021 POST 3RD PARTY REVIEW 07/16/2021 COMPLETED Review Details
10/14/2021 REVISION - - 1ST 11/16/2021 COMPLETED Review Details
12/18/2021 REVISION - - 2ND 01/06/2022 COMPLETED Review Details
12/27/2022 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/05/2023 APPROVED Review Details
12/16/2022 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2022 APPROVED Review Details

Conditions

Permit Number - T21CM03547
Permit Status: Complete
Permit Description: NEW SHELL BUILDING
Date Description Comments
01/05/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
06/29/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/29/2021 SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL
06/29/2021 SPECIAL INSPECTION IS REQUIRED FOR MASONRY
06/29/2021 DEFERRED SUBMITTAL FOR I-JOISTS

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM03547
Permite Description: NEW SHELL BUILDING
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
09/16/2022 COT - LCBU - Masonry Pregrout N/A Canceled {Activity date: 09/16/2022; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A}
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
COT - FCON - Fire - Final N/A Canceled
12/27/2022 COT - LCBU - Sustainability N/A Not Ready
12/27/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
12/27/2022 COT - LCBU - Building Final N/A Not Ready
COT - FCON - Sprinkler - Final N/A Canceled
12/27/2022 COT - LCPL - Plumbing Final N/A Not Ready
12/19/2022 COT - LCEL - Electrical Progress N/A Partial Pass partial approval for temporary disconnect due to lack materials, ok to energize
12/27/2022 COT - LCEL - Grounding/Bonding N/A Not Ready awaiting new switch gear
12/27/2022 COT - LCEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM03547
Permit Description: NEW SHELL BUILDING
Total Completed Inspections - 38
Date Description Inspector Results Comments
03/03/2022 COT - LCPL - Yard Water Line Passed {Activity date: 03/03/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
03/17/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 03/17/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
04/07/2022 COT - LCBU - Roof Nailing Passed {Activity date: 04/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
04/27/2022 COT - LCEL - Electrical Underground Passed {Activity date: 04/27/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, secondary conduits installed from SES to Transformer locations].

} ; {Activity date: 03/09/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - ) Partial, Under foundation raceways for feeders from Electrical room to panel location ok to backfill progress areas.}
05/24/2022 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 05/24/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
05/24/2022 COT - LCPL - Rough Soil Passed {Activity date: 05/24/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for shell (T21CM03547) *Also verified and approved underground rough soil for pending TI (T22CM01578- DentalPro)} ; {Activity date: 03/03/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready}
09/16/2022 COT - HCBU - Exterior Clips/Sheathing Passed {Activity date: 09/16/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/15/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready}
12/27/2022 COT - LCBU - Framing Passed
12/27/2022 COT - LCBU - Stem Wall/Retaining Wall Passed
12/27/2022 COT - LCBU - Excavation/Rebar/Zoning Passed
12/27/2022 COT - LCPL - Sewer Passed
12/27/2022 COT - LCME - Mechanical Final Passed
12/27/2022 COT - LCBU - Building Above Ceiling Passed
12/27/2022 COT - LCPL - Plumbing Above Ceiling Passed
12/27/2022 COT - LCBU - Building Progress Passed
12/27/2022 COT - LCPL - Medical Gas Preconstruction Mtg Passed
12/27/2022 COT - LCPL - Plumbing Progress Passed
12/27/2022 COT - LCME - Mechanical Intermediate Passed
12/27/2022 COT - LCBU - Preslab Passed
12/27/2022 COT - LCEL - Construction Power Passed n/a
12/27/2022 COT - LCME - Mechanical Above Ceiling Passed
12/27/2022 COT - HCBU - Interior Shear Bracing Passed
12/27/2022 COT - LCPL - Plumbing Intermediate Passed
12/27/2022 COT - LCME - Mechanical Progress Passed
12/29/2022 COT - FCON - Fire - Final Passed
12/29/2022 FCON – OH Piping & Hydro Passed
12/29/2022 COT - LCBU - Sustainability Passed
12/29/2022 COT - LCEL - Outdoor Lighting Passed
01/06/2023 BULD - Electrical Clearance Passed
01/06/2023 COT - LCEL - Electrical Intermediate Passed
01/06/2023 COT - LCEL - Electrical Above Ceiling Passed
01/06/2023 COT - LCBU - Building Final Passed
01/10/2023 COT - FCON - Alarm - Final Passed Inspected by Will Motto
01/10/2023 COT - FCON - Sprinkler - Final Passed Inspected by Will Motto on 12/29/22
01/06/2023 COT - LCPL - Plumbing Final Passed
02/21/2023 COT - LCEL - Electrical Progress Passed
02/23/2023 COT - LCEL - Grounding/Bonding Passed
02/23/2023 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FINAL SIC.PDF DOCUMENTS VIEW
PLAN SET REV4.PDF DOCUMENTS VIEW
REV4 REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV4_JOB CARD.PDF DOCUMENTS VIEW
REV4_PERMIT.PDF DOCUMENTS VIEW
2022.12.23 AZ DUCT TESTING_V1.PDF DOCUMENTS VIEW
2022.12.27 WATER REPORT-2022-12-27_V1.PDF DOCUMENTS VIEW
2022.12.12 ORTHOPROS FINAL CERT-2022-12-12_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
COMCHECK CERTIFICATE.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SEWER CAPACITY WAIVER.PDF DOCUMENTS VIEW
STANTEC PSA.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
PERMIT.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF CONSTRPLANS VIEW
REV2_REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV2_PLAN SET.PDF CONSTRPLANS VIEW
REV3_I-JOIST.PDF DOCUMENTS VIEW