Permit: T21CM03503
Permit Details
Apply Date:
04/26/2021
Applicant:
KR BUILDING & DESIGN LLC
Description:
Bedroom bathroom addition; porch and remodel
Contractors:
- Ken Roberts
Permit Reviews
Permit Number - T21CM03503
Permit Status: Final
Permit Description: Bedroom bathroom addition; porch and remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/26/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 05/18/2021 | COMPLETED |
| 05/19/2021 | RESUBMITTAL | 06/07/2021 | COMPLETED |
| 09/17/2021 | REVISION - - 1ST | 09/28/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM03503
Permit Description: Bedroom bathroom addition; porch and remodel
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2021 | PLUMBING - ROUGH, SOIL | RCHANDLER | Approved | -PA. Under slab only |
| 11/10/2021 | PLUMBING - GAS PRESSURE TEST | RCHANDLER | Approved | AP |
| 11/23/2021 | ELECTRIC - UFER | TLUNDBERG | Approved | AP UFER installed at future subpanel |
| 11/23/2021 | BUILDING PRE-SLAB | TLUNDBERG | Approved | AP |
| 11/23/2021 | EXCAVATION/LAYOUT REBAR & ZON | TLUNDBERG | Approved | AP |
| 12/23/2021 | ROOF NAILING | TLUNDBERG | Approved | AP |
| 12/23/2021 | EXT METAL CLIPS/EXT SHEATHING | TLUNDBERG | Approved | AP |
| 12/30/2021 | MECHANICAL - INTERMEDIATE | WGALLAGHER | Approved | Not inspected |
| 12/30/2021 | RESIDENTIAL INTERMEDIATE | WGALLAGHER | Approved | Partial approval DWV not under test, electrical not complete to tankless water heater, Inspection stopped numerous defects, ok to insulate exterior and block fur-outs |
| 12/30/2021 | FRAMING | WGALLAGHER | Approved | Partial approval verify holes drilled in rafters are within limits and complete blocking |
| 01/04/2022 | ELECTRIC - INTERMEDIATE | TLUNDBERG | Approved | AP |
| 01/14/2022 | TEP CLEARANCE - PM | RCHANDLER | Approved | CODE INCR |
| 01/14/2022 | ELECTRIC - SERVICE UPGRADE | RCHANDLER | Approved | AP INCR clearance code for TEP. Left voicemail with Marcia at 11:55AM. |
| 05/11/2022 | ELECTRIC - FINAL | ESTEVENS | Approved | Approved |
| 05/11/2022 | PLUMBING - FINAL | ESTEVENS | Approved | Approved |
| 05/11/2022 | MECHANICAL - FINAL | ESTEVENS | Approved | Approved |
| 05/11/2022 | BUILDING - FINAL | ESTEVENS | Approved | Approved |