Permit: T21CM03449
Permit Details
Apply Date:
04/23/2021
Applicant:
Christopher Gallacher - ABP Electrical
Description:
Installation of 32 roof-mounted panels with a system size of 10.4 kW. Also, MPU to 200amp
Contractors:
- ABP Electrical
Permit Reviews
Permit Number - T21CM03449
Permit Status: Final
Permit Description: Installation of 32 roof-mounted panels with a system size of 10.4 kW. Also, MPU to 200amp
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/08/2021 | COMPLETED |
| 06/17/2021 | REVISION - - 1ST | 06/28/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM03449
Permit Description: Installation of 32 roof-mounted panels with a system size of 10.4 kW. Also, MPU to 200amp
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2021 | ELECTRIC - SERVICE UPGRADE | TGAUSP | Approved | Approved, INCR Clearance was called into TEP (Powerkill) |
| 08/02/2021 | TEP CLEARANCE - PM | TGAUSP | Approved | CODE DGC |
| 08/02/2021 | ELECTRIC - FINAL | TGAUSP | Approved | 1090 and 2090 are both Approved and ready for solar meter, please send DGC Clearance to TEP |
| 08/02/2021 | BUILDING - FINAL | TGAUSP | Approved | 1090 and 2090 are both Approved and ready for solar meter, please send DGC Clearance to TEP |