Permit Details

Status:
Issued
Type:
Commercial Building
Address:
4902 E PIMA ST
Address NEW:
4902 E PIMA ST
Apply Date:
04/22/2021
Applicant:
Description:
The project consists of a partial remodel to an existing fire station and a building addition

Permit Reviews

Permit Number - T21CM03396
Permit Status: Issued
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Start Date Submittal Complete Date Status  
03/08/2022 REVISION - - 1ST 03/09/2022 COMPLETED Review Details
04/07/2022 REVISION - - 1ST 04/08/2022 COMPLETED Review Details
04/14/2022 REVISION - - 2ND 04/20/2022 COMPLETED Review Details
04/22/2021 COMMERCIAL - TI 05/27/2021 COMPLETED Review Details
06/29/2021 RESUBMITTAL 07/26/2021 COMPLETED Review Details
07/30/2021 RESUBMITTAL 11/30/2021 COMPLETED Review Details
03/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/17/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM03396
Permit Status: Issued
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Outstanding Activity Conditions - 9
Date Name
07/13/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/13/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
07/13/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
07/13/2021 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
07/13/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
07/13/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/13/2021 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
07/13/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/13/2021 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.

Conditions

Permit Number - T21CM03396
Permit Status: Issued
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Date Description Comments
07/13/2021 WOOD I-JOISTS MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM03396
Permite Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Outstanding Inspections - 16
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
10/26/2022 COT - LCBU - Masonry Pregrout N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/26/2022 COT - LCEL - Service Upgrade N/A Not Ready
10/26/2022 COT - LCME - Mechanical Above Ceiling N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCME - Mechanical Progress N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Progress N/A Not Ready
10/26/2022 COT - LCBU - Sustainability N/A Not Ready
11/14/2022 COT - LCME - Mechanical Final N/A Partial Pass pending balance report
11/14/2022 COT - LCPL - Plumbing Final N/A Partial Pass pending chlorination report

Completed Inspections

Permit Status: Issued
Permit Number: T21CM03396
Permit Description: The project consists of a partial remodel to an existing fire station and a building addition
Total Completed Inspections - 30
Date Description Inspector Results Comments
04/11/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 04/11/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/06/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Rear addition only.}
04/11/2022 COT - LCBU - Roof Nailing Passed {Activity date: 04/11/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/06/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Rear addition only.}
05/05/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 05/05/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/10/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -PA. Pre-slab wrap.

12-2} ; {Activity date: 03/07/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Underground

}
05/24/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 05/24/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
06/06/2022 COT - LCEL - Electrical Underground Passed {Activity date: 06/06/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved

} ; {Activity date: 05/25/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for secondary lines from SES to secondary SES ok to backfill

}
07/14/2022 COT - LCPL - Rough Soil Passed {Activity date: 07/14/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/01/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
08/09/2022 COT - LCBU - Framing Passed {Activity date: 08/09/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/14/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. All except restrooms.} ; {Activity date: 07/14/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -PA. All except restrooms.
} ; {Activity date: 05/05/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA walls.} ; {Activity date: 04/01/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -PA. Ledgers.}
08/09/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 08/09/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved}
08/09/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 08/09/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved}
08/17/2022 COT - LCEL - Electrical Progress Passed {Activity date: 08/17/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Approved. Bathrooms. Also observed test on domestic water.

} ; {Activity date: 07/14/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -PA. All except restrooms.} ; {Activity date: 07/14/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. All except restrooms.} ; {Activity date: 05/05/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA walls.}
11/14/2022 COT - LCEL - Electrical Final Passed
11/15/2022 COT - FCON - Fire - Final Passed
11/23/2022 COT - LCBU - Building Above Ceiling Passed
11/23/2022 COT - HCBU - Sustainability Passed
11/23/2022 COT - LCBU - Building Final Passed
11/23/2022 COT - LCBU - Building Progress Passed
11/23/2022 COT - LCBU - Excavation/Rebar/Zoning Passed
11/23/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed
11/23/2022 COT - LCBU - Masonry Pregrout Passed
11/23/2022 COT - LCBU - Preslab Passed
11/23/2022 COT - LCEL - Electrical Intermediate Passed
11/23/2022 COT - LCEL - Service Upgrade Passed
11/23/2022 COT - LCME - Mechanical Above Ceiling Passed
11/23/2022 COT - LCME - Mechanical Intermediate Passed
11/23/2022 COT - LCME - Mechanical Progress Passed
11/23/2022 COT - LCPL - Plumbing Progress Passed
11/23/2022 COT - LCBU - Sustainability Passed
02/23/2023 BULD - Electrical Clearance Passed
04/24/2023 COT - LCME - Mechanical Final Passed
04/24/2023 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_CALCULATION SHEET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
REV1_CALCULATION SHEET.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
CHLORINATION REPORT-2023-02-01_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTIONS-2023-02-01_V1.PDF DOCUMENTS VIEW
TEST AND BALANCE_V1.PDF DOCUMENTS VIEW
ASBESTOS AND LBP REPORT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GEO REPORT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
MECHANICAL COM CHECK.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
STRUC CALCS.PDF DOCUMENTS VIEW
SPECIFICATIONS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW