Permit: T21CM02983
Permit Details
Apply Date:
04/07/2021
Applicant:
Mario Salgado/ Freedom forever
Description:
Roof top mounted solar installation using : an inverter, solar panels (modules), a utility disconnect, and a production meter
Contractors:
- Freedom Forever
Completed Inspections
Permit Status: Final
Permit Number: T21CM02983
Permit Description: Roof top mounted solar installation using : an inverter, solar panels (modules), a utility disconnect, and a production meter
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2021 | TEP CLEARANCE - PM | TGAUSP | Approved | CODE DGC |
| 05/20/2021 | ELECTRIC - FINAL | TGAUSP | Approved | |
| 05/20/2021 | BUILDING - FINAL | TGAUSP | Approved |