Permit: T21CM02839
Permit Details
Apply Date:
03/31/2021
Applicant:
Leticia Luna
Description:
SFR
Permit Reviews
Permit Number - T21CM02839
Permit Status: Complete
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 05/13/2021 | COMPLETED |
03/18/2023 | RESIDENTIAL NEW DWELLING v.3 | 03/28/2023 | APPROVED |
01/05/2023 | RESIDENTIAL NEW DWELLING v.2 | 02/02/2023 | REQUIRES RESUBMIT |
12/13/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/14/2022 | REQUIRES RESUBMIT |
Conditions
Permit Number - T21CM02839
Permit Status: Complete
Permit Description: SFR
Date | Description | Comments |
---|---|---|
03/29/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM02839
Permit Description: SFR
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/03/2023 | COT - RSPL - Rough Soil | Passed | ||
07/03/2023 | COT - RSPL - Sewer | Passed | ||
07/05/2023 | COT - RSEL - Electrical Underground | Passed | ||
07/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings are dug to plan specifications, post tension cables are in place, rebar reinforcement is in place, and ufer ground is in place at electrical panel location. | |
07/12/2023 | COT - RSBU - Preslab | Passed | Footings are dug to plan specifications, post tension cables are in place, rebar reinforcement is in place, and ufer ground is in place at electrical panel location. | |
07/12/2023 | COT - RSEL - Grounding/Bonding | Passed | Footings are dug to plan specifications, post tension cables are in place, rebar reinforcement is in place, and ufer ground is in place at electrical panel location. | |
07/31/2023 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
08/09/2023 | BULD - Electrical Clearance | Passed | Approved service panel, ECO Clearance is required for the construction power | |
08/14/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/14/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and cover walls. | |
08/21/2023 | COT - RSPL - Gas Pressure Test | Passed | Ok to set residential gas meter. | |
09/05/2023 | COT - RSPL - Yard Water Line | Passed | ||
09/20/2023 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing are fully operational. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
09/20/2023 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing are fully operational. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
09/20/2023 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete. Mechanical, electrical, and plumbing are fully operational. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
09/20/2023 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing are fully operational. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
09/20/2023 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing are fully operational. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
09/20/2023 | COT - BULD - SWG Clearance | Passed |