Permit: T21CM02266
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3427 E SPEEDWAY BL
Address NEW:
3427 E SPEEDWAY BL
Apply Date:
03/12/2021
Applicant:
Barbara Brown
Description:
New Dunkin Donuts
Permit Reviews
Permit Number - T21CM02266
Permit Status: Complete
Permit Description: New Dunkin Donuts
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2022 | RESUBMITTAL | 01/12/2022 | COMPLETED |
| 01/27/2022 | RESUBMITTAL | 01/31/2022 | COMPLETED |
| 01/31/2022 | RESUBMITTAL | 02/14/2022 | COMPLETED |
| 03/12/2021 | COMMERCIAL - NEW | 04/27/2021 | COMPLETED |
| 09/07/2022 | REVISION - - 1ST | 09/07/2022 | COMPLETED |
| 10/05/2021 | RESUBMITTAL | 10/29/2021 | COMPLETED |
| 12/08/2021 | RESUBMITTAL | 12/14/2021 | COMPLETED |
| 03/13/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/28/2023 | APPROVED |
| 05/18/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/19/2023 | APPROVED |
Conditions
Permit Number - T21CM02266
Permit Status: Complete
Permit Description: New Dunkin Donuts
| Date | Description | Comments |
|---|---|---|
| 03/30/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 03/30/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 03/30/2021 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
| 10/12/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 10/12/2021 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 03/30/2021 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 03/30/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 10/12/2021 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 04/08/2021 | SPECIAL INSPECTION REQUIRED FOR OUTDOOR LIGHTING | |
| 02/14/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM02266
Permite Description: New Dunkin Donuts
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2022 | COT - LCEL - Electrical Underground | N/A | Partial Pass | |
| 10/26/2022 | COT - LCPL - Yard Water Line | N/A | Not Ready | |
| 10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
| 12/07/2022 | COT - LCEL - Construction Power | N/A | Re-inspection required | Metal conduit at Ufer is not bonded at ends. |
| 11/01/2022 | COT - LCEL - Outdoor Lighting | N/A | Partial Pass | |
| 02/03/2023 | COT - LCBU - Sustainability | N/A | Not Applicable | N/A |
| 12/07/2022 | BULD - Electrical Clearance | N/A | Re-inspection required | Metal conduit at Ufer in not bonded at ends. |
| 01/20/2023 | COT - FCON - Fire - Final | N/A | Re-inspection required | Verify fence around property has been removed |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM02266
Permit Description: New Dunkin Donuts
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/28/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 06/28/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. All under slab and grease trap. } |
|
| 07/08/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 07/08/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 07/11/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/08/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready} | |
| 07/11/2022 | COT - LCBU - Preslab | Passed | {Activity date: 07/11/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Insure slab receives termite treatment.} ; {Activity date: 07/08/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready} | |
| 07/29/2022 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover exterior walls. } |
|
| 07/29/2022 | COT - LCBU - Roof Nailing | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to dry in roof system} | |
| 08/24/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 08/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - CODE TMPP} | |
| 08/24/2022 | COT - LCEL - Temporary Service | Passed | {Activity date: 08/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved ok for clearance TMPP } |
|
| 09/13/2022 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved} | |
| 09/21/2022 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/19/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor } |
|
| 09/21/2022 | COT - LCBU - Framing | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/19/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor } |
|
| 09/21/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/19/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor } |
|
| 09/26/2022 | COT - HCBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/26/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} ; {Activity date: 09/22/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for east side, west side from drive in window to store front, north side and south side below monolith store front only, ok to brown coat} ; {Activity date: 09/19/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor } |
|
| 12/14/2022 | COT - LCBU - Building Progress | Passed | sign footings and associated UG conduits. | |
| 01/19/2023 | COT - LCME - Kitchen Hood | Passed | ||
| 01/23/2023 | COT - LCME - Mechanical Final | Passed | equipment is operational | |
| 01/23/2023 | COT - LCPL - Plumbing Final | Passed | all corrections have been made. | |
| 01/23/2023 | COT - LCEL - Electrical Final | Passed | all corrections have been made from last inspection. | |
| 02/01/2023 | COT - LCBU - Building Final | Passed | Recommend issuing C of O. | |
| 02/03/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 02/03/2023 | COT - ENGR - Site - Assurance Release | Passed | ||
| 02/02/2023 | COT - FCON - Fire - Final | Passed | ||
| 02/03/2023 | COT - LCBU - CofO | Passed |