Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
3427 E SPEEDWAY BL
Apply Date:
03/12/2021
Applicant:
Barbara Brown
Description:
New Dunkin Donuts

Permit Reviews

Permit Number - T21CM02266
Permit Status: Complete
Permit Description: New Dunkin Donuts
Start Date Submittal Complete Date Status  
01/07/2022 RESUBMITTAL 01/12/2022 COMPLETED Review Details
01/27/2022 RESUBMITTAL 01/31/2022 COMPLETED Review Details
01/31/2022 RESUBMITTAL 02/14/2022 COMPLETED Review Details
03/12/2021 COMMERCIAL - NEW 04/27/2021 COMPLETED Review Details
09/07/2022 REVISION - - 1ST 09/07/2022 COMPLETED Review Details
10/05/2021 RESUBMITTAL 10/29/2021 COMPLETED Review Details
12/08/2021 RESUBMITTAL 12/14/2021 COMPLETED Review Details
03/13/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/28/2023 APPROVED Review Details
05/18/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/19/2023 APPROVED Review Details

Conditions

Permit Number - T21CM02266
Permit Status: Complete
Permit Description: New Dunkin Donuts
Date Description Comments
03/30/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/30/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/30/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
10/12/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
10/12/2021 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/30/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/30/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
10/12/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/08/2021 SPECIAL INSPECTION REQUIRED FOR OUTDOOR LIGHTING
02/14/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM02266
Permite Description: New Dunkin Donuts
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
11/01/2022 COT - LCEL - Electrical Underground N/A Partial Pass
10/26/2022 COT - LCPL - Yard Water Line N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
12/07/2022 COT - LCEL - Construction Power N/A Re-inspection required Metal conduit at Ufer is not bonded at ends.
11/01/2022 COT - LCEL - Outdoor Lighting N/A Partial Pass
02/03/2023 COT - LCBU - Sustainability N/A Not Applicable N/A
12/07/2022 BULD - Electrical Clearance N/A Re-inspection required Metal conduit at Ufer in not bonded at ends.
01/20/2023 COT - FCON - Fire - Final N/A Re-inspection required Verify fence around property has been removed

Completed Inspections

Permit Status: Complete
Permit Number: T21CM02266
Permit Description: New Dunkin Donuts
Total Completed Inspections - 23
Date Description Inspector Results Comments
06/28/2022 COT - LCPL - Rough Soil Passed {Activity date: 06/28/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. All under slab and grease trap.

}
07/08/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 07/08/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
07/11/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 07/11/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/08/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready}
07/11/2022 COT - LCBU - Preslab Passed {Activity date: 07/11/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Insure slab receives termite treatment.} ; {Activity date: 07/08/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready}
07/29/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 07/29/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover exterior walls.
}
07/29/2022 COT - LCBU - Roof Nailing Passed {Activity date: 07/29/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to dry in roof system}
08/24/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 08/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - CODE TMPP}
08/24/2022 COT - LCEL - Temporary Service Passed {Activity date: 08/24/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved ok for clearance TMPP

}
09/13/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 09/13/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved}
09/21/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 09/21/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/19/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor

}
09/21/2022 COT - LCBU - Framing Passed {Activity date: 09/21/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/19/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor

}
09/21/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 09/21/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/19/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor

}
09/26/2022 COT - HCBU - Exterior Clips/Sheathing Passed {Activity date: 09/26/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} ; {Activity date: 09/22/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for east side, west side from drive in window to store front, north side and south side below monolith store front only, ok to brown coat} ; {Activity date: 09/19/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor

}
12/14/2022 COT - LCBU - Building Progress Passed sign footings and associated UG conduits.
01/19/2023 COT - LCME - Kitchen Hood Passed
01/23/2023 COT - LCME - Mechanical Final Passed equipment is operational
01/23/2023 COT - LCPL - Plumbing Final Passed all corrections have been made.
01/23/2023 COT - LCEL - Electrical Final Passed all corrections have been made from last inspection.
02/01/2023 COT - LCBU - Building Final Passed Recommend issuing C of O.
02/03/2023 COT - LCEL - Outdoor Lighting Passed
02/03/2023 COT - ENGR - Site - Assurance Release Passed
02/02/2023 COT - FCON - Fire - Final Passed
02/03/2023 COT - LCBU - CofO Passed

Documents

File Name Document Type  
ADDRESS CHANGE LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_DEFERRED TRUSS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
PATTISON-2023-05-16_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
ADDRESS CHANGE LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REV1_DEFERRED TRUSS.PDF DOCUMENTS VIEW
FINAL SIC-2023-03-03_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COMCHECK.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW