Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM02187
Permit Details
Apply Date:
03/11/2021
Applicant:
Description:
Install ADDITIONAL 18 MODULES 6.48 kW roof-mounted PV system w/ electrical service upgrade to 200A s
Permit Reviews
Permit Number - T21CM02187
Permit Status: Expired
Permit Description: Install ADDITIONAL 18 MODULES 6.48 kW roof-mounted PV system w/ electrical service upgrade to 200A s
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/11/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 04/04/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T21CM02187
Permit Status: Expired
Permit Description: Install ADDITIONAL 18 MODULES 6.48 kW roof-mounted PV system w/ electrical service upgrade to 200A s
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/11/2021 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T21CM02187
Permite Description: Install ADDITIONAL 18 MODULES 6.48 kW roof-mounted PV system w/ electrical service upgrade to 200A s
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2022 | RSBU - Building Final | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T21CM02187
Permit Description: Install ADDITIONAL 18 MODULES 6.48 kW roof-mounted PV system w/ electrical service upgrade to 200A s
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/18/2021 | COT - RSEL - Service Upgrade | Passed | {Activity date: 05/18/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - } | |
08/09/2021 | PDSD Building Division - TEP PMÂ Clearance | Passed | {Activity date: 08/09/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE DGC} ; {Activity date: 05/18/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - CODE INCR} | |
08/09/2021 | COT - RSEL - Electrical Final | Passed | {Activity date: 08/09/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - 1090 and 2090 are both Approved, there is an existing solar meter. Please send DGC Clearance to TEP } |