Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
03/04/2021
Applicant:
Steve Olson
Description:
Install new cell tower disguised as a Eucalyptus tree. Install new CMU wall enclosure, new electric

Permit Reviews

Permit Number - T21CM01968
Permit Status: Issued
Permit Description: Install new cell tower disguised as a Eucalyptus tree. Install new CMU wall enclosure, new electric
Start Date Submittal Complete Date Status  
03/05/2021 CELL TOWER/ANTENNAS 04/23/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM01968
Permit Status: Issued
Permit Description: Install new cell tower disguised as a Eucalyptus tree. Install new CMU wall enclosure, new electric
Total Outstanding Activity Conditions - 6
Date Name
03/18/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
03/18/2021 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
03/18/2021 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
03/18/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/18/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/18/2021 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM01968
Permite Description: Install new cell tower disguised as a Eucalyptus tree. Install new CMU wall enclosure, new electric
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCEL - Construction Power N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - LCEL - Temporary Service N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T21CM01968
Permit Description: Install new cell tower disguised as a Eucalyptus tree. Install new CMU wall enclosure, new electric
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/19/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 10/19/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - Approved.
Ground ring per plan E-3}
11/19/2021 COT - LCBU - Masonry Pregrout Passed {Activity date: 11/19/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP
Top-out bond beam, last lift.} ; {Activity date: 11/12/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA
2nd lift with bond beam approved to grout.} ; {Activity date: 11/04/2021; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - 1st lift to 2 feet ok.}
12/27/2021 COT - LCEL - Electrical Underground Passed {Activity date: 12/27/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP
4” underground conduit from 400A panel to 3’x3’ Bell hole at switch cabinet.

}
03/30/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 03/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE TEC}
03/30/2022 COT - LCEL - Electrical Final Passed {Activity date: 03/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP
TEP TEC}

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
IT FORM.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN_SET.PDF DOCUMENTS VIEW
PROJECT SPECS.PDF DOCUMENTS VIEW
STRUCTURAL REPORT.PDF DOCUMENTS VIEW