Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2910 E 24TH ST
Address NEW:
2910 E 24TH ST
Apply Date:
03/01/2021
Applicant:
Dora Martinez
Description:
Remodel and Bedroom, Bathroom Addition

Permit Reviews

Permit Number - T21CM01784
Permit Status: Inspections
Permit Description: Remodel and Bedroom, Bathroom Addition
Start Date Submittal Complete Date Status  
03/02/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 03/25/2021 COMPLETED Review Details
03/31/2021 RESUBMITTAL 04/15/2021 COMPLETED Review Details
04/01/2022 REVISION - - 1ST 04/12/2022 COMPLETED Review Details
04/14/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 04/14/2022 COMPLETED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: T21CM01784
Permite Description: Remodel and Bedroom, Bathroom Addition
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
02/18/2022 COT - RSEL - Electrical Underground N/A Canceled {Activity date: 02/18/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Applicable.
} ; {Activity date: 05/19/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by VLEON1 - }
02/18/2022 COT - RSEL - Construction Power N/A Canceled {Activity date: 02/18/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Applicable}
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 RSBU - Building Final N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Inspections
Permit Number: T21CM01784
Permit Description: Remodel and Bedroom, Bathroom Addition
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/19/2021 COT - RSEL - Grounding/Bonding Passed {Activity date: 05/19/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VLEON1 - }
05/19/2021 COT - RSBU - Preslab Passed {Activity date: 05/19/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VLEON1 - APPROVED AND READY TO POUR}
05/19/2021 COT - RSPL - Yard Water Line Passed {Activity date: 05/19/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VLEON1 - }
05/27/2021 COT - RSPL - Rough Soil Passed {Activity date: 05/27/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - } ; {Activity date: 05/19/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VLEON1 - PARTIAL FOR THE ADDITION}
07/07/2021 PDSD Building Division - TEP PM Clearance Passed {Activity date: 07/07/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - CODE INCR/CUTOVER}
07/07/2021 COT - RSEL - Service Upgrade Passed {Activity date: 07/07/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved, clear TEP INCR OK to schedule cut over.}
09/03/2021 COT - RSBU - Roof Nailing Passed {Activity date: 09/03/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1025, 1030. Approved.}
09/03/2021 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 09/03/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1025, 1030. Approved.}
11/04/2021 COT - RSPL - Gas Pressure Test Passed {Activity date: 11/04/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - - Approved, please send Clearance to SWG for meter set} ; {Activity date: 05/27/2021; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - } ; {Activity date: 05/21/2021; Status: Cancelled; Inspector: RELEFANTE; Comment: Entered by VLEON1 - CANCELLED - He failed this morning and is calling back at 3 -
He never called back and I called him and he didn’t answer at 3
Cancel} ; {Activity date: 05/19/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by VLEON1 - }
02/18/2022 COT - RSEL - Outdoor Lighting Passed {Activity date: 02/18/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - APPROVED} ; {Activity date: 02/11/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - partial}
02/18/2022 RSME - Mechanical Progress Passed {Activity date: 02/18/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/19/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by VLEON1 - }
02/22/2022 COT - BULD - SWG Clearance Passed {Activity date: 02/22/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - CODE} ; {Activity date: 11/04/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - CODE}
04/29/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 04/29/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/25/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval need to separate and wrap stakes in contact with horizontal bars and complete post pads} ; {Activity date: 05/19/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by KKARSEN1 - R1: ADD OFFICE}
09/13/2023 COT - LCBU - Framing Passed Ok to complete intermediates for inspection. Roof nailing is complete; Ok to dry-in roof system.
05/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to insulate and cover walls.
03/06/2025 COT - RSME - Mechanical Final Passed
03/06/2025 RSBU - Building Final Passed
03/06/2025 COT - RSPL - Plumbing Final Passed
03/06/2025 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN_SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN_SET.PDF DOCUMENTS VIEW
REV1_JOB CARD.PDF DOCUMENTS VIEW
REV1_PERMIT.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW