Permit: T21CM01720
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1967 W MOLLOHAN DR
Address NEW:
1967 W MOLLOHAN DR
Apply Date:
02/26/2021
Applicant:
John Fendenheim
Description:
Single Family Residence
Permit Reviews
Permit Number - T21CM01720
Permit Status: Complete
Permit Description: Single Family Residence
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 04/14/2021 | COMPLETED |
| 05/18/2021 | RESUBMITTAL | 06/08/2021 | COMPLETED |
| 06/18/2021 | RESUBMITTAL | 06/30/2021 | COMPLETED |
| 07/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/18/2024 | APPROVED |
| 09/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/23/2024 | APPROVED |
Conditions
Permit Number - T21CM01720
Permit Status: Complete
Permit Description: Single Family Residence
| Date | Description | Comments |
|---|---|---|
| 05/26/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 07/22/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 07/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 07/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM01720
Permite Description: Single Family Residence
Total Outstanding Inspections - 14
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 02/21/2023 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | 2nd pour on columns, 4 to 8 feet. |
| 10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 05/08/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 11/30/23: not ready 5/8/24: receptacles not made up in upstairs kitchen, GFCI receptacles required in laundry rooms, GFCI receptacles required for dishwashers, upstairs receptacles not receiving power, cover plate missing at stove receptacles, breaker at main panel tripping. MECHANICAL ELECTRICAL NOT INSPECTED. |
| 10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
| 10/26/2022 | FCON – OH Piping & Hydro | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM01720
Permit Description: Single Family Residence
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/08/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, okay to cover } |
|
| 09/13/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
| 12/01/2022 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 02/08/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 02/28/2023 | COT - LCBU - Framing | Passed | good to dry in roof | |
| 03/01/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/02/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 5/2/2023 | |
| 05/02/2023 | COT - RSEL - Construction Power | Passed | Clearance for TEP ECO. 5/2/2023 | |
| 06/09/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. 6/9/2023 | |
| 05/10/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 05/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/10/2024 | COT - RSBU - Masonry Pregrout | Passed | ||
| 05/10/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 05/10/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/10/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/10/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/10/2024 | COT - RSPL - Sewer | Passed | ||
| 05/10/2024 | RSME - Mechanical Progress | Passed | ||
| 06/26/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 06/26/2024 | COT - RSME - Mechanical Final | Passed | ||
| 06/28/2024 | COT - RSEL - Electrical Final | Passed | 6/26/24: Arc-fault breaker's missing at panel,lock caps at refrigerant lines required, UV coat refrigerant line insulation at exterior,insulation at exterior hose bib required, No access to interior of house. 11/30/23: not ready 5/8/24: receptacles not made up in upstairs kitchen, GFCI receptacles required in laundry rooms, GFCI receptacles required for dishwashers, upstairs receptacles not receiving power, cover plate missing at stove receptacles, breaker at main panel tripping. 6/26/24: receptacles missing at kitchen counter space, AFCI breakers missing throughout at panels, GFCI at dishwasher missing, dishwasher drain not properly secured, HVAC refrigerant lines must be coated for UV protection, lock out caps at AC unit, insulate and wrap hose bib on exterior of house, 6/28/24: corrections made. |
|
| 06/27/2024 | COT - FCON - Sprinkler - Final | Passed | Passed via TF-FCP-0523-00659 | |
| 06/27/2024 | FCON – OH Piping & Hydro | Passed | Passed via TF-FCP-0523-00659 | |
| 06/28/2024 | RSBU - Building Final | Passed | 6/26/24: Arc-fault breaker's missing at panel,lock caps at refrigerant lines required, UV coat refrigerant line insulation at exterior,insulation at exterior hose bib required, No access to interior of house. 11/30/23: not ready 5/8/24: receptacles not made up in upstairs kitchen, GFCI receptacles required in laundry rooms, GFCI receptacles required for dishwashers, upstairs receptacles not receiving power, cover plate missing at stove receptacles, breaker at main panel tripping. 6/26/24: receptacles missing at kitchen counter space, AFCI breakers missing throughout at panels, GFCI at dishwasher missing, dishwasher drain not properly secured, HVAC refrigerant lines must be coated for UV protection, lock out caps at AC unit, insulate and wrap hose bib on exterior of house, 6/28/24: corrections made. |