Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Commercial Building
Address NEW:
9411 E SPEEDWAY BL
Apply Date:
02/25/2021
Applicant:
Description:
C.M.U. Screen Wall, Box Culvert, Retaining Wall - Structural

Permit Reviews

Permit Number - T21CM01684
Permit Status: Expired
Permit Description: C.M.U. Screen Wall, Box Culvert, Retaining Wall - Structural
Start Date Submittal Complete Date Status  
02/25/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 03/08/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM01684
Permit Status: Expired
Permit Description: C.M.U. Screen Wall, Box Culvert, Retaining Wall - Structural
Total Outstanding Activity Conditions - 6
Date Name
02/25/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/03/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
03/03/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
03/03/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
03/03/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
03/03/2021 FUP T21OT00156 MUST BE PAID BEFORE FINAL INSPECTIONS.

Outstanding Inspections

Permit Status: Expired
Permit Number: T21CM01684
Permite Description: C.M.U. Screen Wall, Box Culvert, Retaining Wall - Structural
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/19/2022 COT - LCBU - Framing N/A Canceled {Activity date: 01/19/2022; Status: Not Applicable; Inspector: aquiroz; Comment: Entered by AQUIROZ - }
11/04/2022 COT - LCBU - Building Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Expired
Permit Number: T21CM01684
Permit Description: C.M.U. Screen Wall, Box Culvert, Retaining Wall - Structural
Total Completed Inspections - 5
Date Description Inspector Results Comments
08/19/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 08/19/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -AP

Texted Rich at 8:15

8:18: Ready.

833: No answer on FaceTime

8:36 made contact with Duo.

} ; {Activity date: 08/17/2021; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -CA} ; {Activity date: 08/09/2021; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -CA} ; {Activity date: 07/30/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - PA. West side and North side 70 feet going West.} ; {Activity date: 07/02/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for northeast gate pads and footers} ; {Activity date: 06/22/2021; Status: Partial Approval; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - INSPECTOR RELEFANTED PLACDED IN AP ON 06/22/21. INSPECTOR WGALLAGHER PLACED IN PA ON 07/01/21.} ; {Activity date: 06/15/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. Footings on east and south side, ok to pour.
} ; {Activity date: 06/03/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. Footing rebar for North site screen wall and East corner... ok for concrete}
08/26/2021 COT - LCBU - Masonry Pregrout Passed {Activity date: 08/26/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Rich wants AM

1020 (REINFORCED MASONRY PRE-GROUT)-AP

8:45; no answer} ; {Activity date: 08/24/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA 1st lift of South wall, 60’ from West end. Top out on West wall.

Sent text at 8:49

9:21: Return text; ready now.} ; {Activity date: 08/17/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. Top-out: North wall, above culvert, west wall; North half.} ; {Activity date: 08/12/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - PA. Second lift; West wall, box culvert, and North wall sixty feet from West end.

} ; {Activity date: 08/05/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - PA. 1st lift of West wall, and 80 feet of North wall from West end. 2Nd lift of box culvert at Northwest corner v} ; {Activity date: 07/22/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - PA; Northwest corner, 50 feet West, 1st lift. East entrance gate, top-out. South wall, 60 feet from West end, top-out} ; {Activity date: 07/20/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - PA- South wall; second lift. East wall, from Northeast corner to 60 feet South; second lift.

} ; {Activity date: 07/07/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -PA. First Lift. East wall North 60 feet.} ; {Activity date: 07/02/2021; Status: Partial Approval; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - INSPECTOR RELEFANTED PLACED IN AP. INSPECTOR ESTEVENS PLACED IN PA.} ; {Activity date: 06/30/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VLEON1 - PA. 2nd lift: 40 feet west from Southeast corner. 1st lift: remainder of South wall.} ; {Activity date: 06/25/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for East wall third lift ok to grout and 150’ of south wall 1st lift ok to grout

} ; {Activity date: 06/18/2021; Status: Partial Approval; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/17/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. Top-out of North wall, ok for grout.} ; {Activity date: 06/15/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. North wall, second lift, ok for grout.

} ; {Activity date: 06/10/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. First lift on north wall, ok for grout.

}
01/19/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 01/19/2022; Status: Approved; Inspector: aquiroz; Comment: Entered by AQUIROZ - } ; {Activity date: 06/23/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for 2nd lift on east wall and south wall approx 40’ to west} ; {Activity date: 05/24/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - PARTIAL - WALL REBAR SET, OK TO FORM AND POUR} ; {Activity date: 05/20/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. Retaining wall footing ok to pour.} ; {Activity date: 05/18/2021; Status: Denied; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - DENIED NO CONTACT - Left message on applicants’ phone... no response}
01/19/2022 COT - LCBU - Preslab Passed {Activity date: 01/19/2022; Status: Approved; Inspector: aquiroz; Comment: Entered by AQUIROZ - }
01/19/2022 COT - LCBU - Building Progress Passed {Activity date: 01/19/2022; Status: Approved; Inspector: aquiroz; Comment: Entered by AQUIROZ - }

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
WALL-STRUCTURAL PLANS.PDF CONSTRPLANS VIEW