Permit: T21CM01547
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
263 W GLENN ST BLDG 7
Address NEW:
263 W GLENN ST BLDG 7
Apply Date:
02/19/2021
Applicant:
Erin Hastreiter
Description:
Duplex: DP21-0038
Permit Reviews
Permit Number - T21CM01547
Permit Status: Complete
Permit Description: Duplex: DP21-0038
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/19/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 03/18/2021 | COMPLETED |
| 04/14/2021 | RESUBMITTAL | 04/29/2021 | COMPLETED |
| 06/03/2022 | REVISION - - 1ST | 07/26/2022 | COMPLETED |
| 08/11/2021 | RESUBMITTAL | 08/16/2021 | COMPLETED |
Conditions
Permit Number - T21CM01547
Permit Status: Complete
Permit Description: Duplex: DP21-0038
| Date | Description | Comments |
|---|---|---|
| 08/16/2021 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 08/16/2021 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM01547
Permite Description: Duplex: DP21-0038
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2022 | COT - RSEL - Electrical Underground | N/A | Canceled | {Activity date: 08/11/2022; Status: Not Applicable; Inspector: DQUINN; Comment: Entered by NGARCIA3 - na} |
| 10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
| 11/22/2022 | COT - RSPL - Yard Water Line | N/A | Re-inspection required | 1-Uncover buried line. 2-Provide approved plans. |
| 11/22/2022 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | 1-Need 18” minimum copper before transitioning to per. 2-Need test on DWV. |
| 11/22/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1-Uncover buried line. 2-Provide approved plans. |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM01547
Permit Description: Duplex: DP21-0038
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/01/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap Interior and exterior laundry drain ok to backfill. } ; {Activity date: 07/28/2022; Status: Denied; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Denied. No plans on site. No messages, no contractor listed. None of the requested inspections are ready. } |
|
| 08/11/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap} | |
| 08/11/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap} ; {Activity date: 07/28/2022; Status: Denied; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Denied. No plans on site. No messages, no contractor listed. None of the requested inspections are ready. } |
|
| 08/11/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/11/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap} ; {Activity date: 07/28/2022; Status: Denied; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Denied. No plans on site. No messages, no contractor listed. None of the requested inspections are ready. } |
|
| 09/09/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 09/02/2022; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Canceled by contractor, Zack. } |
|
| 09/29/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to dry in roof system.} ; {Activity date: 09/27/2022; Status: Denied; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Denied. Missing nails in shear walls. No ladder for roof.} | |
| 09/29/2022 | COT - LCBU - Framing | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} | |
| 09/29/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover exterior walls. } ; {Activity date: 09/27/2022; Status: Denied; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Denied. Missing nails in shear walls. No ladder for roof.} |
|
| 12/04/2022 | COT - RSPL - Yard Water Line | Passed | ||
| 12/08/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 12/08/2022 | RSME - Mechanical Progress | Passed | ||
| 12/14/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/14/2022 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 04/04/2023 | COT - RSME - Mechanical Final | Passed | ||
| 04/28/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 04/28/2023 | RSBU - Building Final | Passed | ||
| 04/28/2023 | COT - RSEL - Electrical Final | Passed | ||
| 04/28/2023 | COT - RSEL - Outdoor Lighting | Passed |