Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T21CM01479
Permit Details
Apply Date:
02/19/2021
Applicant:
Jesus Cedeno
Description:
enclose patio into expanded master bedroom and dining room
Permit Reviews
Permit Number - T21CM01479
Permit Status: Expired
Permit Description: enclose patio into expanded master bedroom and dining room
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/19/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 03/18/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Expired
Permit Number: T21CM01479
Permite Description: enclose patio into expanded master bedroom and dining room
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/04/2022 | COT - RSME - Mechanical Final | N/A | Canceled | Inspection Canceled |
11/04/2022 | RSBU - Building Final | N/A | Canceled | Inspection Canceled |
11/04/2022 | COT - RSEL - Electrical Final | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T21CM01479
Permit Description: enclose patio into expanded master bedroom and dining room
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/10/2021 | COT - RSBU - Preslab | Passed | {Activity date: 08/10/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap} | |
08/10/2021 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/10/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap} ; {Activity date: 07/20/2021; Status: Denied; Inspector: RELEFANTE; Comment: Entered by VLEON1 - DE ( Contractor did not have existing footing dug out to verify the size of the footing called out on the plans) } |
|
08/26/2021 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 08/26/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VVERA1 - AP } |
|
09/24/2021 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 09/24/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1035, 1080, 4035. Approved } |
|
09/24/2021 | COT - LCBU - Framing | Passed | {Activity date: 09/24/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1035, 1080, 4035. Approved } ; {Activity date: 08/30/2021; Status: Cancelled; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - Contractor called framing in wanting to get lath so 1035 is canceled for today} |
|
09/24/2021 | RSME - Mechanical Progress | Passed | {Activity date: 09/24/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1035, 1080, 4035. Approved } |