Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permit Details
Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
02/10/2021
Applicant:
Technicians For Sustainability
Description:
roof mount 7.13 kW photovoltaic solar system + 13.5 kWh storage
Contractors:
- Technicians For Sustainability
Permit Reviews
Permit Number - T21CM01230
Permit Status: Final
Permit Description: roof mount 7.13 kW photovoltaic solar system + 13.5 kWh storage
| Start Date |
Submittal |
Complete Date |
Status |
|
| 02/10/2021 |
RESIDENTIAL - BLDG/WWM |
03/21/2021 |
COMPLETED |
Review Details |
| 04/21/2021 |
REVISION - - 1ST |
05/19/2021 |
COMPLETED |
Review Details |
Completed Inspections
Permit Status: Final
Permit Number: T21CM01230
Permit Description: roof mount 7.13 kW photovoltaic solar system + 13.5 kWh storage
Total Completed Inspections - 3
| Date |
Description |
Inspector |
Results |
Comments |
| 06/08/2021 |
BUILDING - FINAL |
TTREMBULAK |
Approved |
|
| 06/17/2021 |
TEP CLEARANCE - AM |
TTREMBULAK |
Approved |
CODE DGC/SOLAR |
| 06/18/2021 |
ELECTRIC - FINAL |
BSTEVENS |
Approved |
BATTERIES WILL BE INSTALLED UNDER A FUTURE PERMIT. |
Documents
| File Name |
Document Type |
|
| 2021-04-21 - UPDATE TO T21CM01230 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| JOB CARD 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| PERMIT 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| POWER CONTROL SYSTEM(PCS) TESLA'S LATTER FOR AHJ 2021-04-21 - UPLOADED FILE TYPE PLANS SUPPORTINGDOCUMENTS SUPPORTINGDOCUMENTS 1 1 1 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 APPROVED DRAWINGS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 APPROVED SPECS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 DRAWINGS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 PLANS REV1 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 SPECS REV1 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 SPECS 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230-TECHNICIANS FOR SUSTAINABILITY-2_9_2021 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM01230 PLANS REV1 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM01230 SPECS REV1 2024 MASS-UPLOAD.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM01230 PLANS REV1.PDF |
DOCUMENTS |
VIEW
|
| _APPROVED T21CM01230 SPECS REV1.PDF |
DOCUMENTS |
VIEW
|
| 2021-04-21 - UPDATE TO T21CM01230.PDF |
DOCUMENTS |
VIEW
|
| JOB CARD.PDF |
DOCUMENTS |
VIEW
|
| PERMIT.PDF |
DOCUMENTS |
VIEW
|
| POWER CONTROL SYSTEM(PCS) TESLA'S LATTER FOR AHJ 2021-04-21 - UPLOADED FILE TYPE PLANS; SUPPORTINGDOCUMENTS; SUPPORTINGDOCUMENTS 1; 1; 1.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 APPROVED DRAWINGS.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 APPROVED SPECS.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 DRAWINGS.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 PLANS REV1.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230-TECHNICIANS FOR SUSTAINABILITY-2_9_2021.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 SPECS REV1.PDF |
DOCUMENTS |
VIEW
|
| T21CM01230 SPECS.PDF |
DOCUMENTS |
VIEW
|