Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3410 S 16TH AV
Apply Date:
02/10/2021
Applicant:
JR Durazo
Description:
New : Restroom (Building C)

Permit Reviews

Permit Number - T21CM01199
Permit Status: Complete
Permit Description: New : Restroom (Building C)
Start Date Submittal Complete Date Status  
02/10/2021 COMMERCIAL - NEW 03/22/2021 COMPLETED Review Details
04/12/2021 RESUBMITTAL 05/10/2021 COMPLETED Review Details
06/10/2022 REVISION - - 2ND 06/24/2022 COMPLETED Review Details
12/21/2021 REVISION - - 1ST 02/17/2022 COMPLETED Review Details
07/31/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/02/2023 APPROVED Review Details
05/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/26/2023 APPROVED Review Details

Conditions

Permit Number - T21CM01199
Permit Status: Complete
Permit Description: New : Restroom (Building C)
Date Description Comments
06/23/2022 SHOP DRAWINGS REQUIRED FOR TRUSS

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM01199
Permite Description: New : Restroom (Building C)
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
07/26/2023 PDSD Site/Engineering Division - Landscaping N/A Partial Pass C OF O FOR BUILDING C ONLY 3410 S 16 TH AV..BUILDING (A )NEED RAILING AND LANDSCAPE
07/26/2023 ENGR Engineering Final N/A Partial Pass Building ( A ) need railing and landscape.

Completed Inspections

Permit Status: Complete
Permit Number: T21CM01199
Permit Description: New : Restroom (Building C)
Total Completed Inspections - 32
Date Description Inspector Results Comments
05/03/2022 COT - LCPL - Rough Soil Passed {Activity date: 05/03/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/16/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 05/16/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap}
06/14/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 06/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved top of wall of building C, okay to grout} ; {Activity date: 06/07/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - PARTIAL, for 1st lift, okay to grout}
06/17/2022 COT - LCPL - Yard Water Line Passed {Activity date: 06/17/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 02/24/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial approval for the 3” main water line from the new back-flow device to Building C. Inspection also performed for Building A and B under separate permits, okay to backfill progress areas}
07/21/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 07/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
07/21/2022 COT - LCBU - Roof Nailing Passed {Activity date: 07/21/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
08/30/2022 COT - LCBU - Framing Passed {Activity date: 08/30/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/21/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready}
10/03/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 10/03/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved. Building C.}
10/10/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 10/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved bldg and plumbing, okay to drywall}
10/10/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
10/10/2022 COT - LCPL - Sewer Passed {Activity date: 10/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/08/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for the 4” sewer line from HCS to within 5’ of building} ; {Activity date: 01/28/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 4” main/ tracer line installed and tested from Property line to Building location ok to backfill progress areas.

}
01/23/2023 COT - LCEL - Electrical Underground Passed
04/27/2023 COT - LCBU - Stem Wall/Retaining Wall Passed Okay for concrete placement. 4/27/2023
05/10/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
05/22/2023 COT - LCBU - Preslab Passed
05/22/2023 COT - LCME - Mechanical Final Passed
05/22/2023 COT - LCME - Mechanical Underground Passed
05/22/2023 COT - LCBU - Building Progress Passed
05/22/2023 COT - LCPL - Plumbing Final Passed
05/22/2023 COT - LCPL - Gas Pressure Test Passed
05/22/2023 COT - FCON - Fire - Final Passed
06/14/2023 TRSP - ROW - Final/Close-Out Passed
05/22/2023 COT - LCEL - Electrical Intermediate Passed
05/22/2023 COT - LCME - Mechanical Above Ceiling Passed
05/22/2023 COT - LCME - Mechanical Intermediate Passed
07/18/2023 COT - LCEL - Outdoor Lighting Passed
07/18/2023 PDSD Site/Engineering Division - NPPO Passed
07/18/2023 COT - LCEL - Electrical Final Passed
07/18/2023 COT - LCBU - Building Final Passed
07/27/2023 PDSD Building Division - Sign Final Passed
07/28/2023 PDSD Site/Engineering Division - Landscaping Passed
07/28/2023 ENGR Engineering Final Passed

Scheduled Inspections

Scheduled Inspections - T21CM01199
Status: Complete
Description: New : Restroom (Building C)
Scheduled Date Description Entered By Entered Date
05/10/2021 COT - LCPL - Plumbing Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
BLDG C COMPRESSIVE REPORTS_V1.PDF DOCUMENTS VIEW
BLDG C FIELD REPORTS_V1.PDF DOCUMENTS VIEW
BLDG C PAD - DENSITY TESTING_V1.PDF DOCUMENTS VIEW
LOS MILAGROS BLDG C- STAMPED SIC-2023-07-31_V1.PDF DOCUMENTS VIEW
MILAGROS B_C CHLORINATION REPORT-2023-05-19_V1.PDF DOCUMENTS VIEW
APPLICATION (2).PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD (2).PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PC APPROVAL OF REV1.PDF DOCUMENTS VIEW
PERMIT (2).PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REV2_TRUSS DRAWINGS.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW