Permit: T21CM01058
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1104 S SANTA RITA AV
Address NEW:
1104 S SANTA RITA AV
Apply Date:
02/04/2021
Applicant:
Yesenia Noriega-Orduno
Description:
SFR
Outstanding Activity Conditions
Permit Number - T21CM01058
Permit Status: Inspections
Permit Description: SFR
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/31/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm |
| 03/31/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T21CM01058
Permite Description: SFR
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections
Permit Number: T21CM01058
Permit Description: SFR
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2023 | COT - RSPL - Rough Soil | Passed | ||
| 09/19/2023 | COT - RSBU - Preslab | Passed | ||
| 09/19/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9/19/23: contractor stated that they will be using two ground rods to ground electric and not a ufer, okay to pour concrete | |
| 09/12/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/12/2024 | COT - RSBU - Roof Nailing | Passed | OK to dry-in roof system | |
| 04/14/2026 | COT - RSPL - Gas Pressure Test | Passed | Passed 4/14/26 CLEARANCE SWG | |
| 04/14/2026 | COT - RSEL - Construction Power | Passed | Passed 4/14/26 CLEARANCE ECO | |
| 04/14/2026 | COT - RSPL - Yard Water Line | Passed | Passed 4/14/26 | |
| 04/14/2026 | COT - RSEL - Grounding/Bonding | Passed | Passed 4/14/26 | |
| 04/14/2026 | RSME - Mechanical Progress | Passed | Passed 4/14/26 | |
| 04/14/2026 | COT - LCPL - Plumbing Intermediate | Passed | Passed 4/14/26 | |
| 04/22/2026 | BULD - Electrical Clearance | Passed | 4/22/26: ECO TEP CLEARANCE | |
| 08/13/2026 | COT - LCBU - Framing | Passed | ||
| 08/13/2026 | COT - RSPL - Sewer | Passed | ||
| 08/13/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 08/13/2026 Intermediates passed prior. Verified drywall screw nail schedule. |
|
| 08/13/2026 | COT - RSEL - Outdoor Lighting | Passed | 08/13/2026 Not ready, call in at finals. |