Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
9800 E RITA RD
Apply Date:
02/02/2021
Applicant:
Lisa Bowers
Description:
New splash pad with plumbing, electrical

Permit Reviews

Permit Number - T21CM01036
Permit Status: Issued
Permit Description: New splash pad with plumbing, electrical
Start Date Submittal Complete Date Status  
02/03/2021 OTHER 03/04/2021 COMPLETED Review Details
02/10/2022 REVISION - - 1ST 02/17/2022 COMPLETED Review Details
12/02/2021 RESUBMITTAL 12/17/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM01036
Permit Status: Issued
Permit Description: New splash pad with plumbing, electrical
Total Outstanding Activity Conditions - 4
Date Name
02/23/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
02/23/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
02/23/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/23/2021 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM01036
Permite Description: New splash pad with plumbing, electrical
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - ENGR - Site - Assurance Release N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T21CM01036
Permit Description: New splash pad with plumbing, electrical
Total Completed Inspections - 12
Date Description Inspector Results Comments
10/18/2021 COT - LCEL - Electrical Underground Passed {Activity date: 10/18/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved OK to cover secondary line

}
02/14/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 02/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP
Top out lift for pump house}
02/23/2022 Pool/Spa - Bonding Grip Passed {Activity date: 02/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP. Splash pad}
03/17/2022 COT - LCBU - Preslab Passed {Activity date: 03/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - . AP
Area surrounding splash pad approved to pour. All metal poles and columns are bonded to the copper bonding grid in the pre-slab area

} ; {Activity date: 02/23/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. Splash pad}
03/21/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 03/21/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - APPROVED} ; {Activity date: 02/14/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA} ; {Activity date: 02/08/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for retaining wall and 1st lift for pump room ok to place concrete

}
05/26/2022 COT - LCBU - Framing Passed {Activity date: 05/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - 1090.Approved}
05/26/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 05/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - 1090.Approved} ; {Activity date: 03/10/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for footing south east retaining wall at entrance, ok to place concrete} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA
5 footings for the splash-pad canopy approved to pour} ; {Activity date: 02/23/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA splash pad} ; {Activity date: 02/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 01/31/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for pump house footer, ok to place concrete}
05/26/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 05/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - 1090.Approved} ; {Activity date: 02/01/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for return lines from pad to pump house

} ; {Activity date: 01/26/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval ok to cover pressure lines on west side of pad no DWV Test} ; {Activity date: 01/21/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CA}
05/26/2022 COT - LCEL - Electrical Final Passed {Activity date: 05/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/23/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR
Cancel other inspections} ; {Activity date: 05/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
05/26/2022 COT - LCBU - Building Progress Passed {Activity date: 05/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - 1090.Approved} ; {Activity date: 03/21/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Canceled} ; {Activity date: 03/21/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 01/26/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for ground wire and electric from splash pad to pump house ok to cover} ; {Activity date: 11/05/2021; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by ESTEVEN1 - }
05/26/2022 COT - LCPL - Yard Water Line Passed {Activity date: 05/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - 1090.Approved} ; {Activity date: 01/21/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA
All water lines to new splash-pad ok to cover. Tested at 34psi.}
05/26/2022 COT - LCPL - Plumbing Final Passed {Activity date: 05/26/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/23/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - NR
Cancel other inspections}

Documents

File Name Document Type  
PLAN SET.PDF CONSTRPLANS VIEW
GEOTECH EVALUATION.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SHADE STRUCTURE CALCS.PDF DOCUMENTS VIEW
SPLASH PAD STRUCT CALCS.PDF DOCUMENTS VIEW