Permit: T21CM00888
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3745 E MONDEGO CT
Address NEW:
3745 E MONDEGO CT
Apply Date:
01/28/2021
Applicant:
clayton abernathy
Description:
MFR MTVA290718 T18-M0095
Permit Reviews
Permit Number - T21CM00888
Permit Status: Complete
Permit Description: MFR MTVA290718 T18-M0095
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/07/2024 | APPROVED |
| 02/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/15/2024 | APPROVED |
Conditions
Permit Number - T21CM00888
Permit Status: Complete
Permit Description: MFR MTVA290718 T18-M0095
| Date | Description | Comments |
|---|---|---|
| 01/28/2021 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 01/28/2021 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/12/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 03/12/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/15/2024 | ISSUED WITH PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P20SD00114 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ | |
| 02/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM00888
Permite Description: MFR MTVA290718 T18-M0095
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | RSPL - Plumbing Progress | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM00888
Permit Description: MFR MTVA290718 T18-M0095
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2021 | COT - RSPL - Sewer | Passed | {Activity date: 02/22/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VLEON1 - APPROVED} | |
| 02/22/2021 | COT - RSPL - Rough Soil | Passed | {Activity date: 02/22/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VLEON1 - APPROVED} | |
| 03/08/2021 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 03/08/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VLEON1 - } | |
| 03/08/2021 | COT - RSBU - Preslab | Passed | {Activity date: 03/08/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VLEON1 - } | |
| 03/08/2021 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 03/08/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VLEON1 - } | |
| 04/15/2021 | COT - RSBU - Roof Nailing | Passed | {Activity date: 04/15/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - } | |
| 04/15/2021 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 04/15/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - } | |
| 09/20/2021 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 09/20/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VVERA1 - AP} | |
| 09/20/2021 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 09/20/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VVERA1 - AP} | |
| 09/20/2021 | RSME - Mechanical Progress | Passed | {Activity date: 09/20/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VVERA1 - AP} | |
| 11/23/2021 | COT - LCBU - Framing | Passed | {Activity date: 11/23/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 11/23/2021 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 11/23/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - CODE ECO} | |
| 11/23/2021 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | {Activity date: 11/23/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 11/23/2021 | COT - RSEL - Electrical Underground | Passed | {Activity date: 11/23/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 11/23/2021 | COT - RSEL - Construction Power | Passed | {Activity date: 11/23/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap Clear eco} |
|
| 12/21/2021 | COT - RSPL - Yard Water Line | Passed | {Activity date: 12/21/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
| 01/13/2022 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 01/13/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap} | |
| 01/19/2024 | RSBU - Building Final | Passed | ||
| 01/19/2024 | COT - RSEL - Electrical Final | Passed | ||
| 01/19/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/19/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 01/19/2024 | COT - RSME - Mechanical Final | Passed |