Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
3410 S 16TH AV
Apply Date:
01/26/2021
Applicant:
Description:
New: Kitchen and Dining (Building A)

Permit Reviews

Permit Number - T21CM00759
Permit Status: Issued
Permit Description: New: Kitchen and Dining (Building A)
Start Date Submittal Complete Date Status  
01/26/2021 COMMERCIAL - NEW 03/17/2021 COMPLETED Review Details
05/06/2021 RESUBMITTAL 12/21/2021 COMPLETED Review Details
06/10/2022 REVISION - - 2ND 06/24/2022 COMPLETED Review Details
12/21/2021 REVISION - - 1ST 02/17/2022 COMPLETED Review Details
02/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/22/2024 REQUIRES RESUBMIT Review Details
10/31/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/02/2023 APPROVED Review Details
11/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/06/2023 REQUIRES RESUBMIT Review Details
10/12/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/16/2023 APPROVED Review Details
03/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.3 03/04/2024 APPROVED Review Details

Conditions

Permit Number - T21CM00759
Permit Status: Issued
Permit Description: New: Kitchen and Dining (Building A)
Date Description Comments
02/27/2024 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
06/23/2022 SHOP DRAWINGS REQUIRED FOR TRUSS
11/02/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/02/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/02/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
11/02/2023 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T21CM00759
Permite Description: New: Kitchen and Dining (Building A)
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCBU - Masonry Pregrout N/A Not Ready
01/04/2023 COT - LCEL - Electrical Above Ceiling N/A Not Ready missing light fixtures above ceiling and need to be made up prior to inspection
01/04/2023 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
01/19/2024 COT - BULD - SWG Clearance N/A Not Applicable
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
01/25/2024 COT - FCON - Fire - Final N/A Partial Pass
10/26/2022 COT - FCON - Hood System - Final N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/27/2022 COT - LCEL - Electrical Final N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T21CM00759
Permit Description: New: Kitchen and Dining (Building A)
Total Completed Inspections - 30
Date Description Inspector Results Comments
05/31/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 05/31/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
07/01/2022 COT - LCPL - Rough Soil Passed {Activity date: 07/01/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover

}
08/26/2022 COT - LCPL - Yard Water Line Passed {Activity date: 08/26/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/28/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial at back-flow preventer, okay to backfill progress areas} ; {Activity date: 06/27/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR, cancelled by Contractor} ; {Activity date: 06/17/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, PROGRESS AREAS OK TO BACKFILL AND PROCEED.

}
10/03/2022 COT - LCBU - Framing Passed {Activity date: 10/03/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved. Building A.}
10/03/2022 COT - LCBU - Roof Nailing Passed {Activity date: 10/03/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved. Building A.}
10/17/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 10/17/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/03/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for interior wall of Building A} ; {Activity date: 05/27/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - PARTIAL, for exterior walls, pending interior footing, okay for concrete placement at exterior walls}
11/14/2022 COT - LCPL - Gas Pressure Test Passed Gas pressure test approved, please send clearance to SWG
11/14/2022 COT - LCEL - Electrical Intermediate Passed Approved, okay to cover walls
11/14/2022 COT - LCPL - Plumbing Intermediate Passed Approved, okay to cover walls
02/13/2023 COT - LCEL - Electrical Above Ceiling Passed All light fixtures are installed in grid ceilings, all junction boxes are properly marked.
02/13/2023 COT - LCME - Mechanical Intermediate Passed ductwork and registers are installed above ceiling and in grid ceilings.
02/17/2023 COT - LCBU - Stem Wall/Retaining Wall Passed forms are ready rebar is in place. okay to pour concrete.
06/05/2023 COT - HCBU - Masonry Pregrout Passed Rebar reinforcement installed per plan for trash enclosure.
10/13/2023 COT - LCEL - Outdoor Lighting Passed
10/13/2023 COT - LCBU - Exterior Clips/Sheathing Passed
10/13/2023 COT - LCME - Mechanical Underground Passed
10/13/2023 COT - LCBU - Building Above Ceiling Passed
10/13/2023 COT - LCBU - Building Progress Passed
10/13/2023 COT - LCPL - Sewer Passed
01/19/2024 COT - FCON - Sprinkler - Final Passed
01/19/2024 ENGR Engineering Final Passed
01/19/2024 TRSP - ROW - Final/Close-Out Passed
01/19/2024 COT - LCBU - Preslab Passed
02/20/2024 COT - FCON - Alarm - Final Passed
02/20/2024 COT - FCON - Fire - Final Passed
02/20/2024 COT - FCON - Hood System - Final Passed
02/21/2024 COT - LCBU - Building Final Passed
02/21/2024 COT - LCEL - Electrical Final Passed
02/21/2024 COT - LCME - Mechanical Final Passed
02/21/2024 COT - LCPL - Plumbing Final Passed

Documents

File Name Document Type  
PYT MILAGROS TAB REPORT_N5 CORRECTED R3_V3.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
BLDG A COMPRESSIVE REPORTS_V1.PDF DOCUMENTS VIEW
BLDG A DENSITY TESTING_V1.PDF DOCUMENTS VIEW
BLDG A SPECIAL INSPECTION REPORTS_V1.PDF DOCUMENTS VIEW
LOS MILAGROS BLDG A STAMPED SIC-2023-10-27_V1.PDF DOCUMENTS VIEW
MILAGROS A CHLORINATION REPORT-2023-10-12_V1.PDF DOCUMENTS VIEW
APPLICATION (2).PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD (2).PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PC APPROVAL OF REV1.PDF DOCUMENTS VIEW
PERMIT (2).PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
REV2_TRUSS DRAWINGS.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW