Permit: T21CM00570
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4632 S 15TH AV
Address NEW:
4632 S 15TH AV
Apply Date:
01/19/2021
Applicant:
Description:
Installation of Roof mounted PV SolarREV4: ELECTRICAL UPGRADE
Permit Reviews
Permit Number - T21CM00570
Permit Status: Complete
Permit Description: Installation of Roof mounted PV SolarREV4: ELECTRICAL UPGRADE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2022 | REVISION - - 3RD | 01/11/2022 | COMPLETED |
| 01/20/2021 | RESIDENTIAL - BLDG/WWM | 02/21/2021 | COMPLETED |
| 02/05/2022 | REVISION - - 3RD | 02/09/2022 | COMPLETED |
| 03/10/2022 | REVISION - - 4TH | 04/01/2022 | COMPLETED |
| 04/05/2021 | REVISION - - 1ST | 05/08/2021 | COMPLETED |
| 07/07/2021 | REVISION - - 2ND | 07/15/2021 | COMPLETED |
| 09/11/2023 | RESIDENTIAL SOLAR v.1 | 09/20/2023 | APPROVED |
Conditions
Permit Number - T21CM00570
Permit Status: Complete
Permit Description: Installation of Roof mounted PV SolarREV4: ELECTRICAL UPGRADE
| Date | Description | Comments |
|---|---|---|
| 01/20/2021 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. | |
| 09/21/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM00570
Permite Description: Installation of Roof mounted PV SolarREV4: ELECTRICAL UPGRADE
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - RSEL - Service Upgrade | N/A | Canceled | Inspection Canceled |
| 09/28/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the service panel upgrade (went from 2 meters to 1) INCR Clearance was called into TEP pending Solar |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM00570
Permit Description: Installation of Roof mounted PV SolarREV4: ELECTRICAL UPGRADE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2023 | BULD - Electrical Clearance | Passed | Approved, DGC clearance to TEP is required for the solar meter | |
| 10/05/2023 | COT - RSEL - Electrical Final | Passed | ||
| 10/05/2023 | RSBU - Building Final | Passed |