Permit: T21CM00496
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3540 N COUNTRY CLUB RD BLDG 3
Address NEW:
3540 N COUNTRY CLUB RD BLDG 3
Apply Date:
01/15/2021
Applicant:
Description:
Duplex one of four DP21-0003
Permit Reviews
Permit Number - T21CM00496
Permit Status: Complete
Permit Description: Duplex one of four DP21-0003
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/15/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 02/22/2021 | COMPLETED |
| 02/23/2021 | RESUBMITTAL | 03/03/2021 | COMPLETED |
| 03/03/2021 | RESUBMITTAL | 03/16/2021 | COMPLETED |
| 09/02/2021 | RESUBMITTAL | 09/16/2021 | COMPLETED |
| 06/08/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM00496
Permite Description: Duplex one of four DP21-0003
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - LCBU - Framing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Electrical Underground | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Construction Power | N/A | Canceled | Inspection Canceled |
| 01/11/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Canceled | |
| 07/05/2023 | COT - RSPL - Yard Water Line | N/A | Partial Pass | Water lines are installed from meter to each unit and is filled with water and pressurized. Waiting on delivery of backflow protection device at street. Okay to backfill trenches and compact soil. |
| 03/28/2023 | RSEL - Electrical Progress | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM00496
Permit Description: Duplex one of four DP21-0003
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/2022 | COT - RSPL - Rough Soil | Passed | Approved HCS connection for common sanitary line for Duplex Bldg 1 and Duplex Bldg 2, okay to backfill | |
| 12/21/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | building 1 and 2 | |
| 12/21/2022 | COT - RSEL - Grounding/Bonding | Passed | building 1 and 2 | |
| 03/28/2023 | COT - RSBU - Preslab | Passed | ||
| 05/03/2023 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 05/30/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/30/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/30/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 07/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Plumbing, electrical, and mechanical rough-in is complete. Okay to insulate, drywall, tape, and texture walls. | |
| 07/05/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Sheathing is installed on one side of shear/firewalls. Type X 5/8" drywall is to be applied to both sides of walls. | |
| 08/04/2023 | COT - RSPL - Yard Water Line | Passed | 8/4/23: Backflow preventer is installed and water line is connected to water meter. Okay to shade and backfill trench from meter to backflow preventer. | |
| 11/14/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/14/2023 | RSBU - Building Final | Passed | ||
| 11/14/2023 | COT - RSEL - Electrical Final | Passed | ||
| 11/14/2023 | COT - RSME - Mechanical Final | Passed | ||
| 11/14/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 11/28/2023 | COT - RSPL - Sewer | Passed | ||
| 11/28/2023 | PDSD Building Division - Unspecified Remote Video | Passed | ||
| 11/28/2023 | BULD - Electrical Clearance | Passed | ||
| 11/28/2023 | COT - BULD - SWG Clearance | Passed | ||
| 11/28/2023 | RSEL - Electrical Progress | Passed | ||
| 11/28/2023 | RSME - Mechanical Progress | Passed | ||
| 12/08/2023 | ENGR Engineering Final | Passed |