Permit: T21CM00311
Permit Details
Apply Date:
01/08/2021
Applicant:
Titan Solar Power
Description:
INSTALLATION OF A 12.920 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
Contractors:
- Titan Solar Power
Permit Reviews
Permit Number - T21CM00311
Permit Status: Final
Permit Description: INSTALLATION OF A 12.920 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/11/2021 | RESIDENTIAL - BLDG/WWM | 02/13/2021 | COMPLETED |
04/07/2021 | REVISION - - 1ST | 05/09/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM00311
Permit Description: INSTALLATION OF A 12.920 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/21/2021 | TEP CLEARANCE - PM | DQUINN | Approved | CODE DGC |
05/21/2021 | ELECTRIC - FINAL | DQUINN | Approved | |
05/21/2021 | BUILDING - FINAL | DQUINN | Approved |