Permit: T21CM00197
Permit Details
Apply Date:
01/06/2021
Applicant:
Titan Solar Power
Description:
INSTALLATION OF A 10.200 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
Contractors:
- Titan Solar Power
Permit Reviews
Permit Number - T21CM00197
Permit Status: Final
Permit Description: INSTALLATION OF A 10.200 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/06/2021 | RESIDENTIAL - BLDG/WWM | 02/11/2021 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM00197
Permit Description: INSTALLATION OF A 10.200 kW-DC SYSTEM; MAIN BREAKER DERATE OF 175A
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2021 | TEP CLEARANCE - PM | RCHANDLER | Approved | CODE DGC |
| 05/05/2021 | ELECTRIC - FINAL | RCHANDLER | Approved | |
| 05/05/2021 | BUILDING - FINAL | RCHANDLER | Approved |