Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
01/04/2021
Applicant:
Tucson Expediting & Development
Description:
Ambulatory Surgery Center
Architects:
  • Carl Benjamin Nelson
Contractors:
  • Kraus Anderson

Permit Reviews

Permit Number - T21CM00071
Permit Status: C of o
Permit Description: Ambulatory Surgery Center
Start Date Submittal Complete Date Status  
01/05/2021 3RD PARTY REVIEW - COMMERCIAL 03/25/2021 COMPLETED Review Details
03/26/2021 RESUBMITTAL 04/06/2021 COMPLETED Review Details
05/19/2022 REVISION - - 4TH 06/09/2022 COMPLETED Review Details
06/29/2021 3RD PARTY REVIEW - REVISION/OTHER 08/26/2021 COMPLETED Review Details
09/03/2021 REVISION - - 2ND 09/22/2021 COMPLETED Review Details
10/20/2021 REVISION - - 3RD 11/09/2021 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T21CM00071
Permit Description: Ambulatory Surgery Center
Total Completed Inspections - 47
Date Description Inspector Results Comments
06/22/2021 ELECTRIC - UFER RCHANDLER Approved
07/13/2021 STEM WALL/RETAINING WALL RCHANDLER Approved AP
08/17/2021 PLUMBING - ROUGH, SOIL WGALLAGHER Approved Approved under slab
08/23/2021 ELECTRIC - UNDERGROUND RCHANDLER Approved AP
08/31/2021 BUILDING PRE-SLAB WGALLAGHER Approved Partial approval under roof main building ok to place concrete
08/31/2021 PLUMBING - PRE SLAB WGALLAGHER Approved Approved
09/10/2021 FIRE SPKLR - UG, PIPING, HYDRO wmotto1 Approved 200 lb pressure test and pipe approved ok to burry.
09/10/2021 PLUMBING - YARD WTR LINE/TEST WGALLAGHER Approved Approved
09/30/2021 EXCAVATION/LAYOUT REBAR & ZON WGALLAGHER Approved Approved including Oxygen yard and dumpster enclosure
11/03/2021 PLUMBING - ROOF DRAINS TLUNDBERG Approved AP
11/05/2021 EXT METAL CLIPS/EXT SHEATHING TLUNDBERG Approved AP
South and west walls
11/16/2021 ROOF NAILING TLUNDBERG Approved AP
Owners 3rd party inspector has approved all decking, insulation board, and membrane for the roofing system.
11/19/2021 ELECTRIC - INTERMEDIATE TLUNDBERG Approved PA. Same as above
11/19/2021 FRAMING TLUNDBERG Approved PA. All framing approved that was not inspected on 11/5/21
As noted on page A-101
12/02/2021 PLUMBING - ABOVE CEILING TLUNDBERG Approved PA

Domestic water approved in rooms 109 & 110 as noted on page A 101.
12/13/2021 MECHANICAL - INTERMEDIATE RCHANDLER Approved AP
12/15/2021 ELECTRIC - OUTDOOR LIGHTING WGALLAGHER Approved Partial approval for light pole bases 9 each ok to place concrete
12/15/2021 SHEET ROCK NAILING WGALLAGHER Approved Partial approval for 136,137, 138,140,141,135,142 east face only, 131 partial for corridor only
12/15/2021 FIREWALL/FIREBARRIER/FIRESTOP WGALLAGHER Approved Not ready
12/15/2021 STUCCO MESH WGALLAGHER Approved Approved
12/21/2021 PLUMBING - INTERMEDIATE TLUNDBERG Approved PA
Column lines A thru E & column lines 1 thru 7
Domestic hot and cold
12/22/2021 PLUMBING - MEDICAL GAS/TEST TLUNDBERG Approved PA
The following med-gas lines were tested in wall at 150 psi
Nitrous Oxide,Carbon Dioxide,Med Air,WAGD,Oxygen,Med Vacuum.
01/12/2022 FIRE SPKLR - OH PIPING & HYDRO jfordney Approved 205 psi
02/23/2022 TEP CLEARANCE - AM WGALLAGHER Approved CODE ECO
03/22/2022 GAS CLEARANCE WGALLAGHER Approved CODE
03/22/2022 PLUMBING - GAS PRESSURE TEST WGALLAGHER Approved Approved ok for clearance SWG
03/25/2022 U VALUE FOR WINDOW WGALLAGHER Approved Approved
04/01/2022 ELECTRIC - CABLE DROP WGALLAGHER Approved Approved
04/01/2022 OUTDOOR LIGHTING FINAL WGALLAGHER Approved Approved
04/14/2022 PLUMBING - MD GAS/PRECONST MTG TLUNDBERG Approved AP
04/15/2022 FIRE SPKLR - FINAL CBASALDUA Approved
04/25/2022 PLUMBING - FINAL TLUNDBERG Approved AP
04/27/2022 ELECTRIC - FINAL TLUNDBERG Approved AP
05/03/2022 SITE - SEWER TLUNDBERG Approved AP
05/12/2022 PLUMBING - GAS PRESS TEST FNL ESTEVENS Approved Approved
06/23/2022 NPPO - FINAL MHERNANDEZ Approved APPROVED
06/23/2022 RIGHT OF WAY - FINAL bmong1 Approved NO WORK IN ROW
07/15/2022 FIRE SPKLR - UG PIPING FLUSH CGates Approved Had been approved by JFordney on 1/12/2022 on permit #T22FC00064
07/15/2022 FIRE - FINAL CGates Approved
07/15/2022 FIRE - ALARM FINAL CGates Approved
07/18/2022 BUILDING ABOVE CEILING WGALLAGHER Approved Approved
07/18/2022 MECHANICAL - ABOVE CEILING WGALLAGHER Approved Approved
07/19/2022 LANDSCAPE - FINAL DROBERTS Approved APPROVED
07/22/2022 ENGINEERING - FINAL DROBERTS Approved IS APPROVED
07/26/2022 MECHANICAL - FINAL TLUNDBERG Approved AP
07/29/2022 ELECTRIC - ABOVE CEILING TLUNDBERG Approved AP 2090
07/29/2022 BUILDING - FINAL TLUNDBERG Approved AP

Documents

File Name Document Type  
COFO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FINAL SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV3_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV3_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV3_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION NARRATIVE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
T21CM00071 - TCO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO 2 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
REV3_JOB CARD.PDF DOCUMENTS VIEW
REV3_PERMIT.PDF DOCUMENTS VIEW
REVISION APPLICATION.PDF DOCUMENTS VIEW
TCO #2.PDF DOCUMENTS VIEW
T21CM00071 - TCO.PDF DOCUMENTS VIEW
REVISION NARRATIVE.PDF DOCUMENTS VIEW
REV3_PLAN SET.PDF DOCUMENTS VIEW
FINAL SIC.PDF DOCUMENTS VIEW
ENERGY CERT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
LETTER.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
GEOTECH.PDF DOCUMENTS VIEW
REV2_INSPECTION CARD.PDF DOCUMENTS VIEW
REV1_SPECS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
MECH CALCS.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
STRUCT CALCS.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
REV1_PLAN SET.PDF CONSTRPLANS VIEW
REV2_PLAN SET.PDF CONSTRPLANS VIEW