Permit: T21BU00272
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
8453 E DESERT STEPPES DR
Address NEW:
8453 E DESERT STEPPES DR
Apply Date:
05/18/2021
Applicant:
CHRIS GOLDEN
Description:
Requires height Per engineer, 6' screen wall above grade, 3' retaining below grade.
Permit Reviews
Permit Number - T21BU00272
Permit Status: Inspections complete
Permit Description: Requires height Per engineer, 6' screen wall above grade, 3' retaining below grade.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/18/2021 | WALLS | 07/02/2021 | COMPLETED |
| 08/15/2023 | RESIDENTIAL NEW DWELLING v.2 | 08/24/2023 | APPROVED |
| 08/24/2023 | RESTAMP - RESIDENTIAL v.1 | 08/24/2023 | APPROVED |
| 08/15/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/15/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: T21BU00272
Permite Description: Requires height Per engineer, 6' screen wall above grade, 3' retaining below grade.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2023 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | 1st lift. Rebar per plan. Okay to grout all walls. 11/14/2023 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: T21BU00272
Permit Description: Requires height Per engineer, 6' screen wall above grade, 3' retaining below grade.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/30/23: vertical reinforcing not per plan, footing width not per plan. 10/31/23: all footing reinforcing per plan. |
|
| 05/15/2024 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 08/05/2024 | COT - RSBU - Masonry Pregrout | Passed | Top out. | |
| 02/07/2025 | ENGR Engineering Final | Passed | Finished wall matches plans. | |
| 02/07/2025 | RSBU - Building Final | Passed | Fence work is complete minus the gate. Okay to close out this permit. | |
| 02/07/2025 | RSBU - Building Progress | Passed |