Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
10/01/2020
Applicant:
AECOM
Description:
This work will involve drilling of 21 soil borings throughout a neighborhood near Silver Island Way and Silver Honey Place. Work will be completed in two phases. Phase 1 will involve completion of 5 borings on October 12-14, 2020. Phase two will involve completion of up to 16 borings on November 2-4, 2020. Please see attached Site Map and Traffic Control Plan for details. Note project dates are anticipated and may change based on date of permit approval. This work is being done on behalf of Arizona Department of Environmental Quality (ADEQ). The borings will be located in the street pavement and drilled up to 15 feet below ground surface. Boring diameters will be approximately 3 inches. Restoration will involve soil cuttings used to backfill the boring to approximately 1 foot below ground surface, and cold patch asphalt will be used to match existing grade
Contractors:
  • GEOMECHANICS SOUTHWEST

Documents

File Name Document Type  
T20RW05361.PDF ROW-RIGHT OF WAY VIEW