Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
08/24/2020
Applicant:
N/A
Description:
B&F Contracting will be installing approximately 42 lf of 8'' CIPP lining Between MH# 6042-18 and 6042-04 and performing manhole rehab work including concrete collars around manholes.
Contractors:
  • BORDER TRAFFIC SAFETY LLC
  • HOFFMAN PROFESSIONAL PIPE SERVICES
  • OLSEN PRECAST STRUCTURES

Completed Inspections

Permit Status: Final
Permit Number: T20RW04749
Permit Description: B&F Contracting will be installing approximately 42 lf of 8'' CIPP lining Between MH# 6042-18 and 6042-04 and performing manhole rehab work including concrete collars around manholes.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/25/2020 TDOT-EXCAV GENERAL INSPECTION MVV Approved Completed. 2 new concrete collars at manholes. Roadway not affected. Closed.

Documents

File Name Document Type  
T20RW04749 R1.PDF ROW-RIGHT OF WAY VIEW
T20RW04749.PDF ROW-RIGHT OF WAY VIEW