Permit: T20RW04493
Permit Details
Apply Date:
08/07/2020
Applicant:
TRAFFIC ENGINEERING DIV
Description:
COVID SLOW STREETS PLACEMENT OF TEMPORARY BARRICADES TO SLOW TRAFFIC ON 15TH AV BETWEEN GRANT ROAD AND GLENN STREET. 09/15/2020 - PLAN CHANGE R1 Begin Phase II Construction of traffic calming improvements. SLOW STREET Traffic Calming devices construction consisting of speed humps, traffic circles, and chicanes.
Contractors:
- KE&G CONSTRUCTION ***APA***
Completed Inspections
Permit Status: Final
Permit Number: T20RW04493
Permit Description: COVID SLOW STREETS
PLACEMENT OF TEMPORARY BARRICADES TO SLOW TRAFFIC ON 15TH AV BETWEEN GRANT ROAD AND GLENN STREET.
09/15/2020 - PLAN CHANGE R1
Begin Phase II Construction of traffic calming improvements. SLOW STREET Traffic Calming devices construction consisting of speed humps, traffic circles, and chicanes.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2020 | TDOT-EXCAV GENERAL INSPECTION | angel flores | Approved | contractor has not finished work no striping on speed humps no RPMs no signage no bowlers installed traffic control devices scattered throughout the roadway will contact barricade company for service |