Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address NEW:
225 E PENNINGTON ST
Apply Date:
08/05/2020
Applicant:
ENVIRONMENTAL GENERAL SERVICES**B
Description:
Phase II Environmental Site Assessment - Pennington & Toole EGSD is conducting environmental assessment activities in support of the Ronstadt Redevelopment Project the week of 8/10/2020. On 8/11/2020, 5 soil samples will be taken (4 shallow and 1 soil/soil gas up to 15 ft bgs) in the Pennington Street and right-of-way. 2 borings will be taken in the street to an approximate depth of 2 ft. The asphalt may need to be sawcut (2x2 ft) in order to take the samples. Coordinating street closure with Sun Tran. An archaeological monitor will be on-site during all sampling activities.
Contractors:
  • RESILIENT DRILLING SERVICES LLC
  • WESTON SOLUTIONS INC

Documents

File Name Document Type  
T20RW04457.PDF ROW-RIGHT OF WAY VIEW