Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
07/23/2020
Applicant:
NORTHERN PIPELINE CONSTRUCTION
Description:
(2) 5X5 BELL HOLE IN DIRT ALLEY/EASEMENT DIG AND INSPECT GAS LINE. ALLEY MUST BE RESTORED TO EXISTING OR BETTER CONDITION. ALLEY SURFACE MUST BE GRADED AND COMPACTED TO CITY STANDARDS AND SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND EXISTING DRAINAGE PATTERNS MUST BE RESTORED AND MAINTAINED. ANY DISTURBED GRAVEL MUST BE REPLACED.

Completed Inspections

Permit Status: Final
Permit Number: T20RW04257
Permit Description: (2) 5X5 BELL HOLE IN DIRT ALLEY/EASEMENT DIG AND INSPECT GAS LINE. ALLEY MUST BE RESTORED TO EXISTING OR BETTER CONDITION. ALLEY SURFACE MUST BE GRADED AND COMPACTED TO CITY STANDARDS AND SPECIFICATIONS FOR PUBLIC IMPROVEMENTS AND EXISTING DRAINAGE PATTERNS MUST BE RESTORED AND MAINTAINED. ANY DISTURBED GRAVEL MUST BE REPLACED.
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/26/2020 TDOT-EXCAV GENERAL INSPECTION Bravin Approved Gas work completed in alley, no issues or repairs needed