Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
7920 E 22ND ST
Apply Date:
06/17/2020
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP will install a 36"x48" metal project notification sign on two 8' steel posts, holes for the posts will be 2" wide and 2' deep. Coordinates for the posts are: 32°12'22.21"N 110°49'24.68"W. Please see attached map for offsets from street. Signs will remain in place for 2 years. Notes: Coordinate sign installation with Traffic Engineering, contact Richard Velde at 520-520-334-8323. Plus any additional sight visibility notes from Greg Orsini. Thank you.
Contractors:
  • SOUTHWEST ENERGY SOLUTIONS

Completed Inspections

Permit Status: Final
Permit Number: T20RW03427
Permit Description: TEP will install a 36"x48" metal project notification sign on two 8' steel posts, holes for the posts will be 2" wide and 2' deep. Coordinates for the posts are: 32°12'22.21"N 110°49'24.68"W. Please see attached map for offsets from street. Signs will remain in place for 2 years. Notes: Coordinate sign installation with Traffic Engineering, contact Richard Velde at 520-520-334-8323. Plus any additional sight visibility notes from Greg Orsini. Thank you.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/17/2020 TDOT-EXCAV GENERAL INSPECTION A.Gomez Approved Sign has been installed on the southeast corner of 22nd Street and Pantano.