Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
6251 S KOLB RD
Apply Date:
06/17/2020
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP will install a 36"x48" metal project notification sign on two 8' steel posts, holes for the posts will be 2" wide and 2' deep. Coordinates for the sign are 32° 8'20.70"N 110°50'25.95"W. Please see attached map for offsets from street. Signs will remain in place for 2 years. Notes: Coordinate sign installation with Traffic Engineering, contact Richard Velde at 520-520-334-8323. Plus any additional sight visibility notes from Greg Orsini. Thank you. No objection as long as WB Valencia motorists do not have vision of the outer NB Kolb travel lane obscured by the sign (i.e. outside sight visibility triangle).
Contractors:
  • SOUTHWEST ENERGY SOLUTIONS

Completed Inspections

Permit Status: Final
Permit Number: T20RW03408
Permit Description: TEP will install a 36"x48" metal project notification sign on two 8' steel posts, holes for the posts will be 2" wide and 2' deep. Coordinates for the sign are 32° 8'20.70"N 110°50'25.95"W. Please see attached map for offsets from street. Signs will remain in place for 2 years. Notes: Coordinate sign installation with Traffic Engineering, contact Richard Velde at 520-520-334-8323. Plus any additional sight visibility notes from Greg Orsini. Thank you. No objection as long as WB Valencia motorists do not have vision of the outer NB Kolb travel lane obscured by the sign (i.e. outside sight visibility triangle).
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/21/2020 TDOT-EXCAV GENERAL INSPECTION A.Gomez Approved Sign installed on the southeast corner of Kolb and Valencia.