Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
06/16/2020
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP will install a 36"x48" metal project notification sign on two 8' steel posts, holes for the posts will be 2" wide and 2' deep. Coordinates for the sign are 32°10'37.99"N 110°50'28.51"W. Please see attached maps for offsets from the street. Signs will remain in place for 2 years. Notes: Coordinate sign installation with Traffic Engineering, contact Richard Velde at 520-520-334-8323. Plus any additional sight visibility notes from Greg Orsini. Thank you. No objection as long as NB Kolb motorists do not have vision of the outer EB Escalante travel lane obscured by the sign (i.e. outside sight visibility triangle).
Contractors:
  • SOUTHWEST ENERGY SOLUTIONS

Completed Inspections

Permit Status: Final
Permit Number: T20RW03403
Permit Description: TEP will install a 36"x48" metal project notification sign on two 8' steel posts, holes for the posts will be 2" wide and 2' deep. Coordinates for the sign are 32°10'37.99"N 110°50'28.51"W. Please see attached maps for offsets from the street. Signs will remain in place for 2 years. Notes: Coordinate sign installation with Traffic Engineering, contact Richard Velde at 520-520-334-8323. Plus any additional sight visibility notes from Greg Orsini. Thank you. No objection as long as NB Kolb motorists do not have vision of the outer EB Escalante travel lane obscured by the sign (i.e. outside sight visibility triangle).
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/20/2020 TDOT-EXCAV GENERAL INSPECTION A.Gomez Approved Sign has been installed on the southwest corner of Kolb and Escalante.