Permit: T20RW03164
Permit Details
Apply Date:
06/03/2020
Applicant:
B & F CONTRACTING
Description:
IN ORDER TO PERFORM A 25 LF EXCAVATION REPAIR OF 10" SEWER LOCATED 0-25 LF SOUTH OF MANHOLE 8390-17. B&F WILL ALSO INSTALL APPROXIMATELY 472 LF OF 10" CIPP LINING B&F WILL UTILIZE A RIGHT LANE CLOSURE FOR NORTH BOUND KOLB RD. PLEASE SEE SITE PLAN FOR FURTHER INFORMATION DUE TO THE PROXIMITY OF THE BUS STOP LOCATED BETWEEN ELI PL AND PRINCETON PL AND THE LACK OF A SAFE PEDESTRIAN CROSSINGS ACROSS KOLB RD, PEDESTRIAN ACCESS WILL HAVE TO BE PROVIDED THROUGH OR AROUND THE WORK SITE AND NOT DIRECTED TO THE OTHER SIDE OF THE STREET.
Contractors:
- HOFFMAN PROPIPE
- OLSEN PRECAST STRUCTURES
Completed Inspections
Permit Status: Final
Permit Number: T20RW03164
Permit Description: IN ORDER TO PERFORM A 25 LF EXCAVATION REPAIR OF 10" SEWER LOCATED 0-25 LF SOUTH OF MANHOLE 8390-17. B&F WILL ALSO INSTALL APPROXIMATELY 472 LF OF 10" CIPP LINING B&F WILL UTILIZE A RIGHT LANE CLOSURE FOR NORTH BOUND KOLB RD. PLEASE SEE SITE PLAN FOR FURTHER INFORMATION
DUE TO THE PROXIMITY OF THE BUS STOP LOCATED BETWEEN ELI PL AND PRINCETON PL AND THE LACK OF A SAFE PEDESTRIAN CROSSINGS ACROSS KOLB RD, PEDESTRIAN ACCESS WILL HAVE TO BE PROVIDED THROUGH OR AROUND THE WORK SITE AND NOT DIRECTED TO THE OTHER SIDE OF THE STREET.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2020 | TDOT-EXCAV GENERAL INSPECTION | A.Gomez | Approved | CIPP lining work completed. Also permanent asphalt patch placed. |