Permit Details

Status:
Final
Type:
Barricade and Excavation
Address NEW:
1010 E SPEEDWAY BL
Apply Date:
06/01/2020
Applicant:
SOUTHWEST GAS
Description:
2020): ATLAS 0031, U OF A: PARK AVE & 2ND STREET. WR 3974298 . - REPLACE 2,399 LF IN CITY RIGHT OF WAY (2,399 LF VIA TRENCHING/BORING IN PAVEMENT; 0 LF VIA TRENCHING/BORING IN DIRT) TCPS ATTACHED Approved Temporary Noise Exemption for occasional night work from 6 P.M. to 6 A.M. Notification to businesses and Sunlink is required prior to working during these hours. CONTRACTOR SHALL CONTACT BEA PAULUS (520- 206-8826) WITH SUNTRANS 48 HRS PRIOR TO STARTING WORK SPEEDWAY BLVD AND PARK AVE, SPEEDWAY BLVD AND MOUNTAIN ARE UNDER PAVEMENT MORATORIUM - ALL LANES IMPACTED SHALL BE MILLED 1 1/2 IN.) AND OVERLAYED W/CITY OF TUCSON MIX #2, FIFTY FT. PAST THE LIMIOTS OF WORK IN BOTH DIRECTIONS WORK IMPACTING SPEEDWAY BLVD SHALL BE PERFORMED BETWEEN 8PM AND 6AM PER TRAFFIC CONTROL PLAN CALL OUT. ALL TRENCHES ON SPEEDWAY BLVD SHALL BE PLATED AND SURFACE OF PLATES SHALL MATCH EXISTING GRADE. ROADWAY SHALL BE OPEN TO TRAFFIC DURING THE DAY
Contractors:
  • NORTHERN PIPELINE CONSTRUCTION C

Completed Inspections

Permit Status: Final
Permit Number: T20RW03098
Permit Description: 2020): ATLAS 0031, U OF A: PARK AVE & 2ND STREET. WR 3974298 . - REPLACE 2,399 LF IN CITY RIGHT OF WAY (2,399 LF VIA TRENCHING/BORING IN PAVEMENT; 0 LF VIA TRENCHING/BORING IN DIRT) TCPS ATTACHED Approved Temporary Noise Exemption for occasional night work from 6 P.M. to 6 A.M. Notification to businesses and Sunlink is required prior to working during these hours. CONTRACTOR SHALL CONTACT BEA PAULUS (520- 206-8826) WITH SUNTRANS 48 HRS PRIOR TO STARTING WORK SPEEDWAY BLVD AND PARK AVE, SPEEDWAY BLVD AND MOUNTAIN ARE UNDER PAVEMENT MORATORIUM - ALL LANES IMPACTED SHALL BE MILLED 1 1/2 IN.) AND OVERLAYED W/CITY OF TUCSON MIX #2, FIFTY FT. PAST THE LIMIOTS OF WORK IN BOTH DIRECTIONS WORK IMPACTING SPEEDWAY BLVD SHALL BE PERFORMED BETWEEN 8PM AND 6AM PER TRAFFIC CONTROL PLAN CALL OUT. ALL TRENCHES ON SPEEDWAY BLVD SHALL BE PLATED AND SURFACE OF PLATES SHALL MATCH EXISTING GRADE. ROADWAY SHALL BE OPEN TO TRAFFIC DURING THE DAY
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/13/2020 TDOT-EXCAV GENERAL INSPECTION DR Approved Excavation-General (Approved) - Gas Line - Permanent patches complete. Final