Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
05/26/2020
Applicant:
COX COMMUNICATIONS
Description:
Riser up on the North side of E Grant Rd and East of Dodge, Overlash 1,140 going East continue going North on the West side of Alvernon 228' continue going South crossing Alvernon to the East and Riser down. On the East side of Alvernon and North of Grant, Trench/bore behind sidewalk going North 140' and Place Cox Vault. BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS. 06/19/2020 - APPROVED WITH ATTACHED CONDITIONS. ALVERNON WAY IS UNDER A MORATORIUM PAVEMENT. PATCHING SHALL COMPLY WITH MORATORIUM PATCHES FOR ALL PAVEMENT PENETRATIONS INCLUDING POT HOLES. CONTRACTOR SHALL MAINTAIN PEDESTRIAN AND BUS STOP ACCESS THROUGH THE WORK SITE. CURRENTLY TCP DOES NOT ADDRESS THIS. A MOBILITY CONTROL PLAN CHECKLIST IS ATTACHED FOR CONTRACTOR INFORMATION. WORK SHALL NOT COMMENCE UNTIL MCP IS DISCUSSED AND APPROVED BY THE ROW INSPECTOR.
Contractors:
  • OPTIMUM AZ INC

Completed Inspections

Permit Status: Final
Permit Number: T20RW02970
Permit Description: Riser up on the North side of E Grant Rd and East of Dodge, Overlash 1,140 going East continue going North on the West side of Alvernon 228' continue going South crossing Alvernon to the East and Riser down. On the East side of Alvernon and North of Grant, Trench/bore behind sidewalk going North 140' and Place Cox Vault. BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS. 06/19/2020 - APPROVED WITH ATTACHED CONDITIONS. ALVERNON WAY IS UNDER A MORATORIUM PAVEMENT. PATCHING SHALL COMPLY WITH MORATORIUM PATCHES FOR ALL PAVEMENT PENETRATIONS INCLUDING POT HOLES. CONTRACTOR SHALL MAINTAIN PEDESTRIAN AND BUS STOP ACCESS THROUGH THE WORK SITE. CURRENTLY TCP DOES NOT ADDRESS THIS. A MOBILITY CONTROL PLAN CHECKLIST IS ATTACHED FOR CONTRACTOR INFORMATION. WORK SHALL NOT COMMENCE UNTIL MCP IS DISCUSSED AND APPROVED BY THE ROW INSPECTOR.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/10/2020 TDOT-EXCAV GENERAL INSPECTION A.Gomez Approved Fiber work completed, observed no damage to existing asphalt.

Documents

File Name Document Type  
T20RW02970.PDF ROW-RIGHT OF WAY VIEW