Permit: T20RW02427
Permit Details
Apply Date:
04/29/2020
Applicant:
KE&G CONSTRUCTION ***APA***
Description:
CIPP LINING BETWEEN MANHOLES MH 9721-18 AND MH 9721-22 NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 Road was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. APPROVED TNE ATTACHED TO PERMIT ***APPROVED FROM WORK AT 6:00 PM - 6:00 AM 04/27/2020 - 05/27/2020 ONLY*** 06/12/2020: NEW APPROVED TNE ATTACHED TO PERMIT ***APPROVED FROM WORK AT 6:00 PM - 6:00 AM 05/25/2020 - 06/25/2020 ONLY***
Contractors:
- PRO-PIPE
Completed Inspections
Permit Status: Final
Permit Number: T20RW02427
Permit Description: CIPP LINING BETWEEN MANHOLES MH 9721-18 AND MH 9721-22
NOTES:
BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS:
BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934
Road was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
APPROVED TNE ATTACHED TO PERMIT
***APPROVED FROM WORK AT 6:00 PM - 6:00 AM 04/27/2020 - 05/27/2020 ONLY***
06/12/2020: NEW APPROVED TNE ATTACHED TO PERMIT
***APPROVED FROM WORK AT 6:00 PM - 6:00 AM 05/25/2020 - 06/25/2020 ONLY***
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2020 | TDOT-EXCAV GENERAL INSPECTION | A.Gomez | Approved | CIPP lining completed, also new manhole concrete collar placed. |