Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
88 W CUSHING ST
Address NEW:
88 W CUSHING ST
Apply Date:
04/25/2020
Applicant:
SOUTHWEST GAS
Description:
(2) 5X5 bellholes in blktp front -- to repair/replace gas line ISSAP NPL *CREWS WILL BE WORKING AT 80 W CUSHING ST NOTES: This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. Cushing was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.

Completed Inspections

Permit Status: Final
Permit Number: T20RW02326
Permit Description: (2) 5X5 bellholes in blktp front -- to repair/replace gas line ISSAP NPL *CREWS WILL BE WORKING AT 80 W CUSHING ST NOTES: This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. Cushing was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/19/2020 TDOT-EXCAV GENERAL INSPECTION Bravin Approved all concrete repairs completed. No issues