HUB IV, NUMBER DP19-0056 CLOSURE OF SIDEWALKS ALONG SPEEDWAY BL FROM TYNDALL AV TO PARK AV. MCP #1 R1 PLAN ADD: ADDITION OF JERSEY BARRIERS ALONG PARK AND EXTENSION OF PERMIT 08/03/2020 - PLAN CHANGE R2 Closure of south lane of Speedway for night pours August 4th & 14th with backup dates of August 5th, 6th, 15th and 17th. 08/03/2020 - PLAN CHANGE R3 Closure of south lane of Speedway for day time hours 08/18/2020 - PLAN CHANGE R4 Closure of 2 south lanes of Speedway for overnight concrete pours 8/21 & 8/28 with backup dates of 8/22, 8/24, 8/29 & 8/31 per approved TNE 08/26/2020 - PLAN CHANGE R5 Closure of 2 south lanes of Speedway for overnight concrete pours 8/21 & 8/27 with backup dates of 8/22, 8/24, 8/28 & 8/30 per approved TNE 09/09/2020 - PLAN CHANGE R6 Closure of 2 south lanes of Speedway for overnight concrete pours September 4th & 11th with backup dates of September 2nd, 3rd, 10th & 12th Work will commence at 11PM per approved TNE 09/09/2020 - PLAN CHANGE R7 Closure of 2 south lanes of Speedway for overnight concrete pours September 17th, 23rd & 29th with backup dates of September 16th, 18th, 22nd, 24th, 28th & 30th starting at 11PM per approved TNE 10/06/2020 - PLAN CHANGE R8 Closure of 2 south lanes of Speedway for overnight concrete pours October 5th, 9th, 15th, 21st & 27th with backup dates of October 6th, 7th, 8th, 10th, 14th, 16th, 20th, 22nd, 26th & 28th Work will commence at 11PM per approved TNE 10/27/20 - R9 PLAN ADD/CHANGE - Closure of 2 south lanes of Speedway for overnight concrete pours November 3rd, 10th and 17th with backup dates of November 2nd, 4th, 9th, 11th, 18th & 19th Work will commence at 11PM per approved TNE 11/09/2020 - PLAN CHANGE R10 Closure of 2 south lanes of Speedway for overnight concrete pours November 3rd, 10th and 17th with backup dates of November 12th & 13th Work will commence at 11PM per approved TNE 11/23/2020 - PLAN CHANGE R11 Closure of 2 south lanes of Speedway for overnight concrete pours November 25th with backup dates of November 24th or 30th Work will commence at 11PM per approved TNE 01/26/2021 - PLAN CHANGE R12 Closure of 1 south lanes of Speedway 2/25-2/28/2021 to dismantle on site crane and set up mobile crane. In case of weather this would be pushed to 3/3-3/7/2021. Extend permit through 6/30/2021. 02/01/21 - PLAN ADD/CHANGE R13 - CLOSURE OF SOUTHERN MOST LANE ON SPEEDWAY FOR ELEVATOR DELIVER 2/4 OR 2/5 02/11/2021 - PLAN ADD/CHANGE R14 - CLOSURE OF SOUTHERN MOST LANE ON SPEEDWAY FOR ROOF DECK CONCRETE POUR ON 02/18/2021. TRAFFIC CONTROL SET-UP AT 6:00 AM NO WORK OR POURING UNTIL SUNRISE. 03/03/2021 - PLAN ADD/CHANGE R15 CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY FOR CONCRETE POUR, SET UP AT 6AM NOO WORK OR POURING UNTIL SUNRISE 03/12/2021 - PLAN ADD/CHANGE - R16 CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY BL TO UTILIZE MOBILE CRANE AND ERECT STEEL CANOPIES ON 03/22/2021 - 03/26/2021. 04/12/2021 - PLAN ADD/CHANGE - R17 CLOSURE OF SOUTHERNMOSTE LANE ON SPEEDWAY TO INSTALL SHOTCRETE ON THE ROOF POOL DECK. DAYTIME WORK ONLY (WORK HOURS SHALL ONLY BE PERMITTED FROM 9:30AM TO 3:30PM 04/30/21 - PLAN ADD/CHANGE - R18 CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY TO INSTALL SHOTCRETE ON THE ROOF POOL DECK. DAYTIME WORK ONLY 05/10/21 - PLAN ADD - R19 SCAFFOLDING TEAR DOWN 05/20/21 - PLAN ADD - PIA WORK PER T20PI00002 / TEMPORARY TRAFFIC CONTROL SETUP WILL ONLY BE PERMITTED BETWEEN THE HOURS OF 9:AM AND 3:30PM (SEE ATTACHED REDLINED MCP - R20 06/01/2021 - PLAN ADD - R21 SITE WORK AND METAL PANEL INSTALL WITH BOOM LIFT. 24 HR LANE CLOSURE BETWEEN 06/07/2021 - 06/14/2021 06/14/2021 - PLAN ADD - R22 PLASTERING ON THE ROOF POOL DECK. UTILIZING SOUTH LANE FOR HOISTING WORK. ALTERNATE DATES OF 06/21 AND 06/23 WEATHER PERMITTING. ONLY ONE DAY WILL BE USED. 06/22/2021 - PLAN ADD - R23 PLASTERING ON THE ROOF POOL DECK. UTILIZING SOUTH LANE FOR BOOM LIFTS/POURING CONCRETE. 06/28/2021 THROUGH 07/03/2021. 07/06/2021 - PLAN ADD - R24 UTILIZING SOUTH LANE TO CRANE MATERIALS TO ROOF TOP. 07/07/2021 - 07/08/2021 07/14/2021 - PLAN ADD - R25 CUT AND PACK BACK ASPHALT ON STREET NEAR CURB LINE 07/22/2021 - PLAN ADD - R26 CLOSE SPEEDWAY SOUTH LANE 07/23/2021 - PLAN ADD - R27 CLOSE SPEEDWAY 7/26 - 7/31 TO UTILIZE BOOM LIFTS TO INSTALL PARAPET CAPS AND FINISH SITE WORK BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS.
Outstanding Inspections
Permit Status: Final
Permit Number: T20RW02155
Permite Description: HUB IV, NUMBER DP19-0056
CLOSURE OF SIDEWALKS ALONG SPEEDWAY BL FROM TYNDALL AV TO PARK AV.
MCP #1
R1 PLAN ADD: ADDITION OF JERSEY BARRIERS ALONG PARK AND EXTENSION OF PERMIT
08/03/2020 - PLAN CHANGE R2
Closure of south lane of Speedway for night pours August 4th & 14th with backup dates of August 5th, 6th, 15th and 17th.
08/03/2020 - PLAN CHANGE R3
Closure of south lane of Speedway for day time hours
08/18/2020 - PLAN CHANGE R4
Closure of 2 south lanes of Speedway for overnight concrete pours 8/21 & 8/28 with backup dates of 8/22, 8/24, 8/29 & 8/31 per approved TNE
08/26/2020 - PLAN CHANGE R5
Closure of 2 south lanes of Speedway for overnight concrete pours 8/21 & 8/27 with backup dates of 8/22, 8/24, 8/28 & 8/30 per approved TNE
09/09/2020 - PLAN CHANGE R6
Closure of 2 south lanes of Speedway for overnight concrete pours September 4th & 11th with backup dates of September 2nd, 3rd, 10th & 12th Work will commence at 11PM per approved TNE
09/09/2020 - PLAN CHANGE R7
Closure of 2 south lanes of Speedway for overnight concrete pours September 17th, 23rd & 29th with backup dates of September 16th, 18th, 22nd, 24th, 28th & 30th starting at 11PM per approved TNE
10/06/2020 - PLAN CHANGE R8
Closure of 2 south lanes of Speedway for overnight concrete pours October 5th, 9th, 15th, 21st & 27th with backup dates of October 6th, 7th, 8th, 10th, 14th, 16th, 20th, 22nd, 26th & 28th Work will commence at 11PM per approved TNE
10/27/20 - R9 PLAN ADD/CHANGE - Closure of 2 south lanes of Speedway for overnight concrete pours November 3rd, 10th and 17th with backup dates of November 2nd, 4th, 9th, 11th, 18th & 19th Work will commence at 11PM per approved TNE
11/09/2020 - PLAN CHANGE R10
Closure of 2 south lanes of Speedway for overnight concrete pours November 3rd, 10th and 17th with backup dates of November 12th & 13th Work will commence at 11PM per approved TNE
11/23/2020 - PLAN CHANGE R11
Closure of 2 south lanes of Speedway for overnight concrete pours November 25th with backup dates of November 24th or 30th Work will commence at 11PM per approved TNE
01/26/2021 - PLAN CHANGE R12
Closure of 1 south lanes of Speedway 2/25-2/28/2021 to dismantle on site crane and set up mobile crane. In case of weather this would be pushed to 3/3-3/7/2021. Extend permit through 6/30/2021.
02/01/21 - PLAN ADD/CHANGE R13 - CLOSURE OF SOUTHERN MOST LANE ON SPEEDWAY FOR ELEVATOR DELIVER 2/4 OR 2/5
02/11/2021 - PLAN ADD/CHANGE R14 - CLOSURE OF SOUTHERN MOST LANE ON SPEEDWAY FOR ROOF DECK CONCRETE POUR ON 02/18/2021. TRAFFIC CONTROL SET-UP AT 6:00 AM NO WORK OR POURING UNTIL SUNRISE.
03/03/2021 - PLAN ADD/CHANGE R15 CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY FOR CONCRETE POUR, SET UP AT 6AM NOO WORK OR POURING UNTIL SUNRISE
03/12/2021 - PLAN ADD/CHANGE - R16
CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY BL TO UTILIZE MOBILE CRANE AND ERECT STEEL CANOPIES ON 03/22/2021 - 03/26/2021.
04/12/2021 - PLAN ADD/CHANGE - R17
CLOSURE OF SOUTHERNMOSTE LANE ON SPEEDWAY TO INSTALL SHOTCRETE ON THE ROOF POOL DECK. DAYTIME WORK ONLY (WORK HOURS SHALL ONLY BE PERMITTED FROM 9:30AM TO 3:30PM
04/30/21 - PLAN ADD/CHANGE - R18
CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY TO INSTALL SHOTCRETE ON THE ROOF POOL DECK. DAYTIME WORK ONLY
05/10/21 - PLAN ADD - R19
SCAFFOLDING TEAR DOWN
05/20/21 - PLAN ADD - PIA WORK PER T20PI00002 / TEMPORARY TRAFFIC CONTROL SETUP WILL ONLY BE PERMITTED BETWEEN THE HOURS OF 9:AM AND 3:30PM (SEE ATTACHED REDLINED MCP - R20
06/01/2021 - PLAN ADD - R21
SITE WORK AND METAL PANEL INSTALL WITH BOOM LIFT. 24 HR LANE CLOSURE BETWEEN 06/07/2021 - 06/14/2021
06/14/2021 - PLAN ADD - R22
PLASTERING ON THE ROOF POOL DECK. UTILIZING SOUTH LANE FOR HOISTING WORK. ALTERNATE DATES OF 06/21 AND 06/23 WEATHER PERMITTING. ONLY ONE DAY WILL BE USED.
06/22/2021 - PLAN ADD - R23
PLASTERING ON THE ROOF POOL DECK. UTILIZING SOUTH LANE FOR BOOM LIFTS/POURING CONCRETE. 06/28/2021 THROUGH 07/03/2021.
07/06/2021 - PLAN ADD - R24
UTILIZING SOUTH LANE TO CRANE MATERIALS TO ROOF TOP. 07/07/2021 - 07/08/2021
07/14/2021 - PLAN ADD - R25
CUT AND PACK BACK ASPHALT ON STREET NEAR CURB LINE
07/22/2021 - PLAN ADD - R26
CLOSE SPEEDWAY SOUTH LANE
07/23/2021 - PLAN ADD - R27
CLOSE SPEEDWAY 7/26 - 7/31 TO UTILIZE BOOM LIFTS TO INSTALL PARAPET CAPS AND FINISH SITE WORK
BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION.
PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE.
INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION.
MAINTAIN PEDESTRIAN ACCESS.
MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/20/2020 | TDOT-EXCAV GENERAL INSPECTION | N/A | Continued | Phone Precons for HUB 4. 24 Hour Closures of Tyndall, Park (SW), and Speedway (SW). Setups to be done this week. |