Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
145 S 5TH AV
Address NEW:
145 S 5TH AV
Apply Date:
04/01/2020
Applicant:
UTILITY UNDERGROUND
Description:
INSTALL WATER LINE 1) The contractor. shall plate the trench over night. The plate shall be flush with existing pavement surface. 2) Detour sings on the traffic control plan shall, include the following “local traffic only”. 3) Ingress/egress for deliveries and garbage pick up shall be maintained. 4) Ingress/egress for properties south end of Herbert Ave on the west of road shall be maintained. 05/06/2020 PLAN ADDITION- ADD GAS LINE WORK TO PERMIT INSTALL GAS LINE FROM EAST SIDE OF HERBERT TO WEST SIDE INTO THE PROPERTY 05/27/2020 - R5 PLAN ADDITION - WATER TAP ON BROADWAY BL 15’L X 2’W X 4’D.

Completed Inspections

Permit Status: Final
Permit Number: T20RW01955
Permit Description: INSTALL WATER LINE 1) The contractor. shall plate the trench over night. The plate shall be flush with existing pavement surface. 2) Detour sings on the traffic control plan shall, include the following “local traffic only”. 3) Ingress/egress for deliveries and garbage pick up shall be maintained. 4) Ingress/egress for properties south end of Herbert Ave on the west of road shall be maintained. 05/06/2020 PLAN ADDITION- ADD GAS LINE WORK TO PERMIT INSTALL GAS LINE FROM EAST SIDE OF HERBERT TO WEST SIDE INTO THE PROPERTY 05/27/2020 - R5 PLAN ADDITION - WATER TAP ON BROADWAY BL 15’L X 2’W X 4’D.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/10/2020 TDOT-EXCAV GENERAL INSPECTION Bravin Approved All water, sewer and gas has been installed on Herbert, including a water Tie in on 12th and one on Broadway. Herbert will be repaved completely upon completion of new high reise apartments. Will monitor patches on Broadway and if needed will notify contractor