Permit: T20RW00827
Permit Details
Apply Date:
02/10/2020
Applicant:
CENTURYLINK
Description:
N.567889 - JOB WILL TRENCH 45' OF NEW FUTUREPATH AND PLACE 624' OF NEW AERIAL FUTUREPATH. ACCESS HH #12140 REQUIRED TO SPLICE FIBER. REMOVE ONE PEDESTAL AND REPLACE WITH A CHARLES PEDESTAL CONTRACTOR SHALL NOT SET UP TRAFFIC CONTROL PRIOR TO 9:00AM AND SHALL REMOVE TRAFFIC CONTROL PRIOR TO 3:30PM CONTRACTOR SHALL CALL BEA PAULUS (520) 206-8826 W/ SUN TRAN 48HRS PRIOR TO STARTING WORK
Completed Inspections
Permit Status: Final
Permit Number: T20RW00827
Permit Description: N.567889 - JOB WILL TRENCH 45' OF NEW FUTUREPATH AND PLACE 624' OF NEW AERIAL FUTUREPATH. ACCESS HH #12140 REQUIRED TO SPLICE FIBER. REMOVE ONE PEDESTAL AND REPLACE WITH A CHARLES PEDESTAL
CONTRACTOR SHALL NOT SET UP TRAFFIC CONTROL PRIOR TO 9:00AM AND SHALL REMOVE TRAFFIC CONTROL PRIOR TO 3:30PM
CONTRACTOR SHALL CALL BEA PAULUS (520) 206-8826 W/ SUN TRAN 48HRS PRIOR TO STARTING WORK
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/22/2020 | TDOT-EXCAV GENERAL INSPECTION | MVV | Approved | Completed. All work in dirt shoulder. Sidewalk and roadway not affected. Closed. |