Permit Details

Status:
Final
Type:
Barricade and Excavation
Address NEW:
10352 E VIA DEL MAR
Apply Date:
01/21/2020
Applicant:
N/A
Description:
B&F Contracting Inc. will be Installing approximately 276 lf of 8'' CIPP Lining Between MH# 2402-08 and 2402-03, Additionally 2402-08 Will have a new concrete collar installed on it. Traffic control will consist of a typical flagger setup on E Via Del Mar and a righ lane closure for south bound Houghton rd at Via del mar. Please see TCP and site plan for additional information
Contractors:
  • BORDER TRAFFIC SAFETY LLC
  • OLSEN PRECAST STRUCTURES
  • PROFESSIONAL PIPE SERVICES

Completed Inspections

Permit Status: Final
Permit Number: T20RW00349
Permit Description: B&F Contracting Inc. will be Installing approximately 276 lf of 8'' CIPP Lining Between MH# 2402-08 and 2402-03, Additionally 2402-08 Will have a new concrete collar installed on it. Traffic control will consist of a typical flagger setup on E Via Del Mar and a righ lane closure for south bound Houghton rd at Via del mar. Please see TCP and site plan for additional information
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/09/2020 TDOT-EXCAV GENERAL INSPECTION BMONG Approved COMPLETE
NEW CONCRETE COLLAR AROUND MANHOLE

Documents

File Name Document Type  
T20RW00349.PDF ROW-RIGHT OF WAY VIEW