Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
134 N LANGLEY AV
Address NEW:
134 N LANGLEY AV
Apply Date:
01/13/2020
Applicant:
B & F CONTRACTING
Description:
B&F Contracting Inc. will Install two segments of CIPP at this Location at 135 N Langley will be approximately 71 lf of 8'' CIPP lining between Manhole 8402-04 and 8402-03 The second at 157 N Langley will have an excavation repair located 60-100 lf from manhole 8402-02 then approximately 100 lf of 8'' CIPP lining will be installed between MH# 8402-02 and 8402-01. Traffic control will consist of an alley closure in the area of work and closure of some parking spaces on private property. please see site plan and TCP for more details.
Contractors:
  • OLSEN PRECAST STRUCTURES
  • PROFESSIONAL PIPE SERVICES

Completed Inspections

Permit Status: Final
Permit Number: T20RW00154
Permit Description: B&F Contracting Inc. will Install two segments of CIPP at this Location at 135 N Langley will be approximately 71 lf of 8'' CIPP lining between Manhole 8402-04 and 8402-03 The second at 157 N Langley will have an excavation repair located 60-100 lf from manhole 8402-02 then approximately 100 lf of 8'' CIPP lining will be installed between MH# 8402-02 and 8402-01. Traffic control will consist of an alley closure in the area of work and closure of some parking spaces on private property. please see site plan and TCP for more details.
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/02/2020 TDOT-EXCAV GENERAL INSPECTION MVV Approved Completed. All work in dirt alley. Replaced 2 concret manhole collars.

Documents

File Name Document Type  
T20RW00154.PDF ROW-RIGHT OF WAY VIEW