Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Address NEW:
1461 S CAMINO SANTIAGO
Apply Date:
12/24/2020
Applicant:
XAVIER S CAMPOS
Description:
SFR AND SHOP
Architects:
  • N/A
Contractors:
  • XAVIER S CAMPOS

Permit Reviews

Permit Number - T20CM09018
Permit Status: Final
Permit Description: SFR AND SHOP
Start Date Submittal Complete Date Status  
03/15/2021 RESUBMITTAL 03/16/2021 COMPLETED Review Details
12/24/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 02/17/2021 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T20CM09018
Permit Description: SFR AND SHOP
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/16/2021 ELECTRIC - UFER TGAUSP Approved
04/16/2021 EXCAVATION/LAYOUT REBAR & ZON TGAUSP Approved APPROVED IN ENGINEERED FILL
04/30/2021 PLUMBING - ROUGH, SOIL TGAUSP Approved APPROVED - OK TO COVER
05/07/2021 BUILDING PRE-SLAB TGAUSP Approved APPROVED AND READY TO POUR
07/09/2021 ROOF NAILING TGAUSP Approved
07/09/2021 EXT METAL CLIPS/EXT SHEATHING TGAUSP Approved
08/12/2021 MECHANICAL - INTERMEDIATE TGAUSP Approved Approved
08/12/2021 FRAMING TGAUSP Approved Partial, pending plumbing intermediates
08/13/2021 PLUMBING - GAS PRESSURE TEST JBURGE Approved Approved.
08/13/2021 PLUMBING - INTERMEDIATE JBURGE Approved Approved.
08/13/2021 RESIDENTIAL INTERMEDIATE JBURGE Approved Approved. Ok to insulate and cover walls
09/10/2021 PLUMBING - SEWER HCS CONNECT RELEFANTE Approved AP
09/10/2021 PLUMBING - YARD WTR LINE/TEST RELEFANTE Approved AP
11/15/2021 TEP CLEARANCE - PM ESTEVENS Approved CODE ECO
11/15/2021 ELECTRIC - CONSTRUCTION POWER ESTEVENS Approved Approved. The TEP clearance code is ECO.
03/25/2022 MECHANICAL - FINAL TGAUSP Approved Approved
03/25/2022 PLUMBING - FINAL TGAUSP Approved Approved
03/25/2022 OUTDOOR LIGHTING FINAL TGAUSP Approved Approved
03/25/2022 ELECTRIC - FINAL TGAUSP Approved Approved
03/25/2022 BUILDING - FINAL TGAUSP Approved Approved

Documents

File Name Document Type  
'PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FOOTING DETAIL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN_SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FOOTING DETAIL.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN_SET.PDF DOCUMENTS VIEW