Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2130 E AJO WY
Apply Date:
12/10/2020
Applicant:
Description:
TCO to occupy Restaurant

Permit Reviews

Permit Number - T20CM08649
Permit Status: Complete
Permit Description: TCO to occupy Restaurant
Start Date Submittal Complete Date Status  
03/12/2021 RESUBMITTAL 04/16/2021 COMPLETED Review Details
04/19/2021 RESUBMITTAL 04/30/2021 COMPLETED Review Details
05/10/2021 RESUBMITTAL 05/19/2021 COMPLETED Review Details
08/09/2021 RESUBMITTAL 08/09/2021 COMPLETED Review Details
12/10/2020 COMMERCIAL - NEW 02/08/2021 COMPLETED Review Details

Conditions

Permit Number - T20CM08649
Permit Status: Complete
Permit Description: TCO to occupy Restaurant
Date Description Comments
01/12/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
01/12/2021 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
01/12/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
01/12/2021 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/13/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
01/12/2021 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
01/12/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
01/12/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/09/2021 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM08649
Permite Description: TCO to occupy Restaurant
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/07/2022 COT - LCBU - Building Final N/A Canceled Inspection Canceled
11/07/2022 ENGR Engineering Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Complete
Permit Number: T20CM08649
Permit Description: TCO to occupy Restaurant
Total Completed Inspections - 37
Date Description Inspector Results Comments
08/13/2021 COT - LCPL - Rough Soil Passed {Activity date: 08/13/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved for soil and grease lines}
09/13/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 09/13/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to cover progress areas.}
09/14/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 09/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
09/15/2021 COT - LCBU - Preslab Passed {Activity date: 09/15/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to pour}
10/12/2021 COT - LCEL - Electrical Underground Passed {Activity date: 10/12/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for 4” conduits from 1200A panel location at building to TEP transformer, okay to backfill} ; {Activity date: 09/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/24/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Conduits installed from gear section location to Electrical room and branch circuits under slab ok to backfill progress.}
10/29/2021 COT - LCBU - Masonry Pregrout Passed {Activity date: 10/29/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 10/15/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, final lift for the south and west interior walls at the service yard.} ; {Activity date: 10/13/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial, 4th lift of the south and west interior service walls.} ; {Activity date: 10/08/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Masonry top out at 19’4” ok to grout.} ; {Activity date: 10/04/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial, 2nd lift of building} ; {Activity date: 09/29/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial, building 1st lift}
11/12/2021 COT - LCPL - Sewer Passed {Activity date: 11/12/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for sewer and to 2000 gallon grease trap at east side of building (Rudy’s). Okay to backfill all progress areas

}
11/17/2021 COT - LCBU - Building Progress Passed {Activity date: 11/17/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved, construction meeting concerning upcoming intermediate inspections}
11/18/2021 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 11/18/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - - Approved, okay to cover}
11/18/2021 COT - LCPL - Yard Water Line Passed {Activity date: 11/18/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved for 2” domestic water, okay backfill progress areas when ready} ; {Activity date: 11/12/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR} ; {Activity date: 11/04/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR, cancelled by Contractor} ; {Activity date: 11/03/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Inspection canceled by contractor}
12/02/2021 COT - LCBU - Roof Nailing Passed {Activity date: 12/02/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved, okay to roof}
12/17/2021 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 12/17/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
12/17/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 12/17/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
01/06/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 01/06/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
01/06/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 01/06/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
01/07/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 01/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, no ceiling}
01/07/2022 COT - LCBU - Framing Passed {Activity date: 01/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
01/07/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 01/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, no ceiling}
02/23/2022 COT - LCBU - Sustainability Passed {Activity date: 02/23/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
03/18/2022 COT - HCBU - Exterior Clips/Sheathing Passed {Activity date: 03/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/17/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 02/23/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Applicable}
04/13/2022 COT - LCEL - Construction Power Passed {Activity date: 04/13/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved, please send ECO Clearance to TEP for the construction power at 2180 E Ajo Wy} ; {Activity date: 10/12/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by VVERA1 - NR}
04/13/2022 COT - LCEL - Temporary Service Passed {Activity date: 04/13/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for construction power}
04/13/2022 BULD - Electrical Clearance Passed {Activity date: 04/13/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - CODE ECO

}
04/18/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 04/18/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - CODE ECO}
05/05/2022 COT - LCPL - Gas Pressure Test Passed {Activity date: 05/05/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved clear Southwest Gas

} ; {Activity date: 04/27/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - not ready}
05/05/2022 COT - BULD - SWG Clearance Passed {Activity date: 05/05/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - CODE GAS}
05/24/2022 COT - LCME - Mechanical Final Passed {Activity date: 05/24/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/25/2021; Status: Prior to Final Inspectn; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - AIR BALANCE REPORT AND HOOD PERFORMANCE TEST REQUIRED}
05/24/2022 COT - LCEL - Outdoor Lighting Passed {Activity date: 05/24/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/24/2022 COT - LCEL - Electrical Final Passed {Activity date: 05/24/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
05/24/2022 COT - LCPL - Plumbing Final Passed {Activity date: 05/24/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, water disinfection report submitted for approval.} ; {Activity date: 05/23/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} ; {Activity date: 08/09/2021; Status: Prior to Final Inspectn; Inspector: LBOWERS; Comment: Entered by LBOWERS1 - WATER QUALITY REPORT IS REQUIRED PRIOR TO FINAL INSPECTION}
05/31/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 05/31/2022; Status: Approved; Inspector: Jfordney; Comment: Entered by JFORDNE1 - Approved by c. basaldua on 5/16/2022} ; {Activity date: 05/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
06/02/2022 COT - LCME - Kitchen Hood Passed {Activity date: 06/02/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/31/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, pending Fire approval

} ; {Activity date: 05/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 01/24/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Smoke test complete for small HOOD grease duct, ok to fire wrap.

} ; {Activity date: 01/21/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 12/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, first Fyre Wrap on grease duct ok to proceed with second layer.} ; {Activity date: 12/17/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial smoke test for 25’ horizontal duct, ready for fire wraps}
06/02/2022 COT - FCON - Alarm - Final Passed {Activity date: 06/02/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } ; {Activity date: 05/31/2022; Status: Partial Approval; Inspector: Jfordney; Comment: Entered by JFORDNE1 - see t21fc00408} ; {Activity date: 05/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
06/02/2022 COT - FCON - Fire - Final Passed {Activity date: 06/02/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } ; {Activity date: 05/31/2022; Status: Denied; Inspector: Jfordney; Comment: Entered by JFORDNE1 - Alarm and hood shall be approved} ; {Activity date: 05/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
06/02/2022 COT - FCON - Hood System - Final Passed {Activity date: 06/02/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } ; {Activity date: 05/31/2022; Status: Denied; Inspector: Jfordney; Comment: Entered by JFORDNE1 - see T21FC00720} ; {Activity date: 05/23/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
08/02/2022 COT - ENGR - Site - Assurance Release Passed {Activity date: 08/02/2022; Status: Approved; Inspector: aruiz; Comment: Entered by ARUIZ1 - in file}
02/03/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
HEALTH DEPARTMENT PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HEALTH DEPARTMENT SIGN OFF 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HEALTH DEPARTMENT PERMIT.PDF DOCUMENTS VIEW
HEALTH DEPARTMENT SIGN OFF.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET REV1.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
TCO.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ENGINEERING DESIGN CALCS.PDF DOCUMENTS VIEW
ENERGY COMPLIANCE CERTIFICATES.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
COMMERCIAL SUBMITTAL REQUIREMENTS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW